Values and project management methodology PMP--

  • Ten idiom about project management:
    • Plan ahead (planning, risk): identifying risks, make plans, and the designated authority;
    • Preventive measure (monitoring, corrective): continuous real-time monitoring of planning, monitoring and detection of deviations and correct them;
    • Resource integration (integration, Procurement): put together the most professional resource is the value. The larger the project, the more resources not owned by me, but the more as I used to;
    • Just right (scope, quality): can be dry quit to quit, you quit working out of range. Quality management in place, namely to achieve acceptance criteria specified contractual commitment of our established inside.
    • Behave (process system): 49 to comply with the process. Integrated Change Control program (Project Manager magic!).
    • Perseverance (goal, the change): to ensure the achievement of the goals;
    • Integrated Micro into the (organizational process assets): change document records, documents, to be immediately recorded in the event, such as the demand register, change the register;
    • Transparency (communication, participation): the project is to emphasize the sense of participation thing, be sure to let everyone participate in the project is to improve. Choose their own way knees have to finish! To ensure smooth information.
    • Help each other (and win-win, good faith): Do not have to take advantage of thinking!
    • Their duties (authorization, equality): According to the project charter, project sponsors can not even pre-empt;