Li will report Scrum operational requirements 2018092609-2 topics + burn 05
This job requires See: https://edu.cnblogs.com/campus/nenu/2019fall/homework/8678
First, the case team
leader: He Jingwen
Members: Peng Siyu Yang Ping Wang Zhiwen bit barracks
Team name: Victory Point
Two, Scrum regular
Time: September 30, 2019
The Scrum Master: Bit barracks
1 requires work photo
2 requires time span
At 09:06 on September 30, 2019 to at 09:53 on September 30, 2019
A total of 47 minutes
Requirement 3 locations
A cafeteria on the second floor, Northeast Normal west aisle
Requirements 4 Legislative Council include:
(1) Yesterday's results
1. survey of user needs;
2. discuss the overall flow of the program design;
3. Build prototype program interface;
4. Learning the use of video software.
(2) Today's plan
1. Learn JAVAScript, plan on playing alpha stage programming;
2. Discuss the game required data;
3. Draw the game interface with blade
(3) current difficulties
Ordered programming foundation is weak, unable to assess specific programming effort
Requirements 5 TODO List
Task ID |
task |
Mandate holders |
deadline |
status |
1 |
September 26 per person want a project topics, including those of the main functions) |
Holder |
September 26, 22:11 |
completed |
2 |
September 26 is determined daily and regular meeting time and place of the meeting master |
Holder |
September 26, 22:11 |
completed |
3 |
Establish the project in leangoo site, add all the members of this group |
He Jingwen |
September 26, 22:11 |
completed |
4 |
September 26 Scrum legislature plus burndown report |
Yang Ping |
September 26, 24:00 |
completed |
5 |
September 27 Scrum legislature plus burndown report |
He Jingwen |
September 27, 21:00 |
completed |
6 |
September 28 Scrum legislature plus burndown report |
Peng Siyu |
September 28, 15:49 |
completed |
7 |
Write completed shooting video of September 28 script |
Yang Ping |
September 28, 17:00 |
completed |
8 |
September 28 to determine the topics and the division of labor
|
Holder |
September 28 |
completed |
9 |
September 29 Scrum legislature plus burndown report |
Wang Zhiwen |
September 29, 18:30 |
completed |
10 |
September 30 Scrum legislature plus burndown report |
Bit barracks |
September 30, 23:00 |
completed |
11 |
September 30 JAVAScript learn basic grammar |
Bit barracks |
September 30 |
completed |
12 |
September 30 to discuss the game required data |
Holder |
September 30, 9:38 |
completed |
13 |
September 30 to draw the game interface with a blade |
Peng Siyu |
September 30, 20:21 |
completed |
14 |
October 8 Scrum legislature plus burndown report |
Yang Ping |
October 8, 23:00 |
Not been |
15 |
October 9 Scrum legislature plus burndown report |
He Jingwen |
October 9, 23:00 |
Not been |
16 |
Publish a blog, topics to show graphic form |
Pending (determined subsequent meeting) |
October 9, 16:00 |
Not been |
17 |
And shoot video clips |
Pending (determined subsequent meeting) |
October 9, 23:00 |
Not been
|
Third, burndown
1 requires the use of [ https://www.leangoo.com/ ].
Requirement 2 with daily updates and Legislative Council report was released on the same blog.
3 is consistent with the longitudinal axis of the reporting requirements Scrum todo list function portion, i.e., burn-function point and the ordinate the number todo same task list, perform the same function has burndown point and number of tasks completed todo list.
Leangoo billboards link: https: //www.leangoo.com/kanban/board/go/3021699#
This job requires See: https://edu.cnblogs.com/campus/nenu/2019fall/homework/8678
First, the case team
leader: He Jingwen
Members: Peng Siyu Yang Ping Wang Zhiwen bit barracks
Team name: Victory Point
二、Scrum例会
时间:2019年9月30日
本次Scrum Master:位军营
要求1 工作照片
要求2 时间跨度
2019年9月30日09:06 至 2019年9月30日09:53
共计47分钟
要求3 地点
东北师范大学一食堂二楼西面靠近过道
要求4 立会内容包括:
(1)昨天的成绩
1.进行用户需求的问卷调查;
2.讨论程序设计的整体流程;
3. 建立程序界面的雏形;
4. 学习视频软件的用法。
(2)今天的计划
1.学习JAVAScript,准备进行游戏alpha阶段编程工作;
2.讨论游戏所需数据;
3. 用墨刀画出游戏界面
(3)目前的困难
有序编程基础比较薄弱,无法评估具体的编程工作量
要求5 todo list
任务ID |
任务 |
任务执行人 |
截止日期 |
状态 |
1 |
9月26日每人想一个项目选题,包括主要那些功能) |
所有人 |
9月26日22:11 |
已完成 |
2 |
9月26日确定每日会议master与例会时间地点 |
所有人 |
9月26日22:11 |
已完成 |
3 |
在leangoo网站中建立项目,添加本小组全部成员 |
贺敬文 |
9月26日22:11 |
已完成 |
4 |
9月26日Scrum立会报告加燃尽图 |
杨萍 |
9月26日 24:00 |
已完成 |
5 |
9月27日Scrum立会报告加燃尽图 |
贺敬文 |
9月27日21:00 |
已完成 |
6 |
9月28日Scrum立会报告加燃尽图 |
彭思雨 |
9月28日15:49 |
已完成 |
7 |
9月28日完成拍摄视频的剧本的编写 |
杨萍 |
9月28日17:00 |
已完成 |
8 |
9月28日确定选题和分工
|
所有人 |
9月28日 |
已完成 |
9 |
9月29日Scrum立会报告加燃尽图 |
王志文 |
9月29日18:30 |
已完成 |
10 |
9月30日Scrum立会报告加燃尽图 |
位军营 |
9月30日23:00 |
已完成 |
11 |
9月30号学JAVAScript基本语法 |
位军营 |
9月30号 |
已完成 |
12 |
9月30号讨论游戏所需数据 |
所有人 |
9月30日9:38 |
已完成 |
13 |
9月30号用墨刀画出游戏界面 |
彭思雨 |
9月30日20:21 |
已完成 |
14 |
10月8日Scrum立会报告加燃尽图 |
杨萍 |
10月8日23:00 |
未进行 |
15 |
10月9日Scrum立会报告加燃尽图 |
贺敬文 |
10月9日23:00 |
未进行 |
16 |
发布博客一篇,以图文形式展示选题 |
待定(后续开会时确定) |
10月9日16:00 |
未进行 |
17 |
拍摄视频并剪辑 |
待定(后续开会时确定) |
10月9日23:00 |
未进行
|
三、燃尽图
要求1 使用 [https://www.leangoo.com/]。
要求2 每日更新并与立会报告发布在同一博客中。
要求3 纵轴与Scrum报告中的 todo list部分中的功能相符,即燃尽图纵轴功能点数与todo list任务数相同,燃尽图已完成功能点数与todo list已完成任务数相同。
Leangoo看板链接:https://www.leangoo.com/kanban/board/go/3021699#