Construction of the law 20191010-9 alpha week 1/2 Scrum burn Legislative Council report + 07

This operational requirements see https://edu.cnblogs.com/campus/nenu/2019fall/homework/8752

This blog is a team job

Leader: CMS Members: Fuyu Ze are Xuedong Qi Wenhua plum rain this legislature master: CMS

Requirements 1 photo work. Requirements enabled phone time (synchronized with the Beijing) with GPS recording function, take pictures, do not use any software modifications lead to exif change .

  

Time span in claim 2, to the minute, when to start and when to end. Recommendations about half an hour.  

  Nian 2019 10 Yue 15 Ri  11: 09-11: 36 long 27 minutes

Requirements 3 Location

  A former canteen woods

4 legislature content requirements  

  (1) yesterday's results:

    a. connections continue to discuss the front and back and connected to the database

    b. Preliminary discussions contribution allocation rules

    c. discuss the issue with the database server.

       (2) Today's plan:

    a. determine the contribution of allocation rules

    b. Verify and emphasized code specifications

  (3) current difficulties:

    a. applet server problems have not been resolved, so that the back-end database is not yet connected.

Requirements 5 todo list

 

Burndown

1 requires the use of [ https://www.leangoo.com/ ].

  Kanban address https://www.leangoo.com/kanban/board/go/3033930#

Requirement 2 with daily updates and Legislative Council report was released on the same blog.

3 is consistent with the longitudinal axis of the reporting requirements Scrum todo list function portion, i.e., the ordinate function burn
point and todo same task list number, burndown function point has been completed and the number of tasks completed list todo
same.

 