This operational requirements see https://edu.cnblogs.com/campus/nenu/2019fall/homework/9915
This blog is a team job
Leader: CMS Members: Fuyu Ze are Xuedong Qi Wenhua Yang Ping The legislature master: Fuyu Ze
Requirements 1 photo work. Requirements enabled phone time (synchronized with the Beijing) with GPS recording function, take pictures, do not use any software modifications lead to exif change .
Time span in claim 2, to the minute, when to start and when to end. Recommendations about half an hour.
Nian 11 2019 Yue 05 Ri 16: 00-16: 25 long 25 Fenzhong
Requirements 3 Location
Computer House 107
4 legislature content requirements
(1) yesterday's results:
a. implement discuss the leaderboard.
(2) Today's plan:
a. discuss the contribution of the principle of distribution.
b. Add the function button
(3) current difficulties:
a. support for leaderboards server connection issues.
Requirements 5 todo list
Burndown
1 requires the use of [ https://www.leangoo.com/ ].
Kanban address https://www.leangoo.com/kanban/board/go/3073061
Requirement 2 with daily updates and Legislative Council report was released on the same blog.
3 is consistent with the longitudinal axis of the reporting requirements Scrum todo list function portion, i.e., the ordinate function burn
point and todo same task list number, burndown function point has been completed and the number of tasks completed list todo
same.