Construction of the law 2019092609-2 topic Scrum burndown Legislative Council report + 03

This operational requirements see https://edu.cnblogs.com/campus/nenu/2019fall/homework/8680

This blog is a team job

Leader: CMS Members: Fuyu Ze are Xuedong Qi Wenhua plum rain this legislature master: Qi Wenhua

Requirements 1 photo work. Requirements enabled phone time (synchronized with the Beijing) with GPS recording function, take pictures, do not use any software modifications lead to exif change .

  

Time span in claim 2, to the minute, when to start and when to end. Recommendations about half an hour.

  At 11:10 on September 30 beginning to the end of 11:42, a total of 32 minutes throughout

Requirements 3 Location

       Two Northeast Normal University cafeteria door woods

4 legislature content requirements 

  (1) yesterday's results
     select the topic and find a teacher to confirm. It is not recognized.

    (2) Today's plan
           a. To continue the discussion topic.
      b. Students previous reference topics direction, change topic ideas.
  (3) the current difficult
   to determine topics: topics and exchange ideas before the teacher found not correct, refer to the views of the teacher changed the direction of topics, determine the topics as soon as possible.

Requirements 5 todo list

  

Burndown

1 requires the use of [ https://www.leangoo.com/ ].

  Kanban address https://www.leangoo.com/kanban/board/go/3022523

Requirement 2 with daily updates and Legislative Council report was released on the same blog.

3 is consistent with the longitudinal axis of the reporting requirements Scrum todo list function portion, i.e., the ordinate function burn
point and todo same task list number, burndown function point has been completed and the number of tasks completed list todo
same.

  