This operational requirements see https://edu.cnblogs.com/campus/nenu/2019fall/homework/9955
This blog is a team job
Leader: CMS Members: Fuyu Ze are Xuedong Qi Wenhua Yang Ping The legislature master: CMS
(The legislature Fuyu Ze students absent)
Requirements 1 photo work. Requirements enabled phone time (synchronized with the Beijing) with GPS recording function, take pictures, do not use any software modifications lead to exif change .
Time span in claim 2, to the minute, when to start and when to end. Recommendations about half an hour.
Nian 11 2019 Yue 08 Ri 17: 5334 Length: 19-17 minutes
Requirements 3 Location
A cafeteria on the first floor
4 legislature content requirements
(1) yesterday's results:
a. Creative updates.
(2) Today's plan:
a. implement leaderboards.
b. to further improve the program, settlement procedures, there are still a bug.
(3) current difficulties:
a. to solve the splash screen problem.
Requirements 5 todo list
Burndown
1 requires the use of [ https://www.leangoo.com/ ].
Kanban address https://www.leangoo.com/kanban/board/go/3087081#
Requirement 2 with daily updates and Legislative Council report was released on the same blog.
3 is consistent with the longitudinal axis of the reporting requirements Scrum todo list function portion, i.e., the ordinate function burn
point and todo same task list number, burndown function point has been completed and the number of tasks completed list todo
same.