Li will report Scrum operational requirements 2018092609-2 topics + burn 05

This job requires See: https://edu.cnblogs.com/campus/nenu/2019fall/homework/8678

 

First, the case team
leader: He Jingwen
Members: Peng Siyu Yang Ping Wang Zhiwen bit barracks
Team name: Victory Point

Two, Scrum regular
Time: September 30, 2019
The Scrum Master: Bit barracks

1 requires  work photo

 

 

 

 

2 requires  time span

At 09:06 on September 30, 2019 to at 09:53 on September 30, 2019

A total of 47 minutes

Requirement 3  locations

A cafeteria on the second floor, Northeast Normal west aisle

Requirements 4  Legislative Council include:

(1) Yesterday's results

1. survey of user needs;

2. discuss the overall flow of the program design;

3. Build prototype program interface;

4. Learning the use of video software.

(2) Today's plan

1. Learn JAVAScript, plan on playing alpha stage programming;

2. Discuss the game required data;

3. Draw the game interface with blade

(3) current difficulties

Ordered programming foundation is weak, unable to assess specific programming effort

Requirements 5  TODO List

 

Task ID

task

Mandate holders

deadline

status

1

September 26 per person want a project topics, including those of the main functions)

Holder

September 26, 22:11

completed

2

September 26 is determined daily and regular meeting time and place of the meeting master

Holder

September 26, 22:11

completed

3

Establish the project in leangoo site, add all the members of this group

He Jingwen

September 26, 22:11

completed

4

September 26 Scrum legislature plus burndown report

Yang Ping

September 26, 24:00

completed

5

September 27 Scrum legislature plus burndown report

He Jingwen

September 27, 21:00

completed

6

September 28 Scrum legislature plus burndown report

Peng Siyu

September 28, 15:49

completed

7

Write completed shooting video of September 28 script

Yang Ping

September 28, 17:00

completed

8

September 28 to determine the topics and the division of labor

 

Holder

September 28

completed

9

September 29 Scrum legislature plus burndown report

Wang Zhiwen

September 29, 18:30

completed

10

September 30 Scrum legislature plus burndown report

Bit barracks

September 30, 23:00

completed

11

September 30 JAVAScript learn basic grammar

Bit barracks

September 30

completed

12

 September 30 to discuss the game required data

     Holder

  September 30, 9:38

      completed

13

 September 30 to draw the game interface with a blade

     Peng Siyu

   September 30, 20:21

     completed

14

October 8 Scrum legislature plus burndown report

Yang Ping

October 8, 23:00

Not been

15

October 9 Scrum legislature plus burndown report

He Jingwen

October 9, 23:00

Not been

16

Publish a blog, topics to show graphic form

Pending (determined subsequent meeting)

October 9, 16:00

Not been

17

      And shoot video clips

Pending (determined subsequent meeting)

October 9, 23:00

Not been

 

 

Third, burndown


1 requires the use of [ https://www.leangoo.com/ ].

Requirement 2 with daily updates and Legislative Council report was released on the same blog.

3 is consistent with the longitudinal axis of the reporting requirements Scrum todo list function portion, i.e., burn-function point and the ordinate the number todo same task list, perform the same function has burndown point and number of tasks completed todo list.

Leangoo billboards link: https: //www.leangoo.com/kanban/board/go/3021699#

 

Guess you like

Origin www.cnblogs.com/unclejokermr/p/11614210.html
Recommended