Concise sorting of knowledge points in the soft test - scope confirmation and easy to mix concepts

    The knowledge points that are easily confused with the scope of confirmation include the scope of confirmation and verification of products, quality control, and project closure. The following is a comparative analysis.

    (1) Confirm the scope and verify the product

    Verification of the product is for the completion of the product, which is verified by the sponsor or customer at the end of the project (or phase), emphasizing whether the product is complete; the scope of confirmation is for the project deliverables, and the customer or sponsor confirms the process of acceptance at the end of the phase .

    (2) Confirmation scope and quality control

    Validation scope differs from quality control in that:

    Validation scope mainly emphasizes the acceptance of the deliverables by the client or sponsor; quality control emphasizes the correctness of the deliverables and compliance with the specific quality requirements (quality standards) established for them.

    Quality control is generally carried out before the scope of confirmation, but can also be carried out at the same time; the scope of confirmation is generally carried out at the end of the stage, and quality control is not necessarily carried out at the stage.

    Quality control is an internal inspection carried out by the corresponding quality department of the executing organization; the scope of confirmation is the inspection and acceptance of project deliverables by external stakeholders (clients or sponsors).

    In terms of the level of detail of inspection, verifying the product, confirming the scope and quality control is a progressive, more and more detailed inspection process.

    (3) Confirm the scope and close the project

    Confirmation scope differs from project closeout in that:

    While both Scope Validation and Project Closing are not performed in phases, Scope Validation emphasizes the verification and acceptance of chlorine deliverables, while Project Closure emphasizes the procedural work required to close the project (or phase).

    Confirmation scope and project closeout have acceptance work. Confirmation scope emphasizes acceptance of project deliverables, and project closeout emphasizes acceptance.

    For more knowledge points and related exam questions over the years, please look for conciseness in the application treasure. If you are busy with projects and have thought about soft exams, you need conciseness!