SAP S / 4 HANA Changes - Master Data: Material Master
1 , material code
Material code length is extended from 18 to 40.
2 , the material master data relevant fields of foreign trade
The below mentioned fields for Letter of Credit/ Legal control/Export control/ Preference management in Foreign Trade is supported by GTS from S/4HANA1511 release onwards and not through Material Master:
· CAP product list no.
· CAP prod. group
· Preference status
· Vendor decl. status
· Exemption Certificate
· Exemption Cert. No.
· Iss.date of ex.cert.
· Military goods
Trade-related function is replaced by a more complete GTS (Global Trade Services).
ETC:
HANA:
3 , MRP2 view field: no quota arrangement
MRP2: MRP considers quota arrangements always,henceforth it is not required to switch it on in the material master.
oQuota arr.usage.
ECC:
HANA:
4、MRP4:以下字段没有了
BOM explosion /dependent Requirement tab inMRP4
oSelectionMethod选择方法字段没有了
Repetitive manufacturing /assembly /deploymentstrategy tab of MRP4
oAction control
ofair sharerule
opushdistribution
oDeploymenthorizon.
ECC:
HANA:
5、增加了物料类型:SERV
6、批次
The following transactions related to Logistics Batch Management are not available in SAP S/4HANA, on-premise edition 1511: MSC1, MSC2, MSC3 and MSC4.The functional equivalent in SAP S/4HANA, on-premise
edition 1511 are the following transactions:
? MSC1N Create Batch
? MSC2N Change Batch
? MSC3N Display Batch
? MSC4N Display Change Documents for Batch