project content
This work belongs courses http://www.cnblogs.com/nwnu-daizh/
Where this requirement in the job https://www.cnblogs.com/nwnu-daizh
Team Name ABCD group
Job learning objectives (1) master the object-oriented requirements analysis methods; (2) learning software system architecture and database logic design, learn the preparation of the software system design specifications, control system design process, design principles and techniques.

A. Github project team warehouse address link

GitHub

II. Update Github repository, "Software Requirements Specification"

 

"Software Requirements Specification"

本次实验,我们改善了上次项目中的《需求规格说明书》的不足之处,着重改善了需求分析在上次实验过程中的不规范之处,在原来需求分析的基础上进行了补充完善。对于该系统的目标和特点也相应做了一点改善,着重改善了需求规定中对功能的规定,对于功能的规定有更深,更确切的说明。

Three. "Project team needs analysis to improve"

1, lack of analysis "project requirements specifications," the

In last week's "requirements specifications" We also need to improve are:

. A description will not be published to github repository;    

. B not be edited in accordance with the national standard;

2, the positioning reference feature 8.5 "Construction law" and priority is given four quadrants functional analysis.

          The first quadrant (killer function, essential requirements): Enter the model you want to search the home page there are several direct explosion models Click here

        The second quadrant (peripheral functions necessary requirements): registration, login, forgotten password, collecting their favorite models

        The third quadrant (peripheral functions, auxiliary demand): man-machine interface to achieve human-computer interaction

        The fourth quadrant (killer function, auxiliary demand): easy to modify their own information and check vehicle they want


3, the preparation of the team project WBS



4, the overall framework of the project team



5, the preparation of the project team ER diagram



6, for example, FIG. Analysis




 


4, team members estimate the time required for each task































member



task



time



Zhu Shijing



Backstage



Three weeks



Ma Yuqin



database



Two weeks



Qiu Shi research



test



Two weeks



Yao Liang



front end



Two weeks



 


5, system design experience team project summary


       By previous experiments, we reflect on his own shortcomings, strengthen the learning UML further understanding of the design of system functions. At the same time by referring to GB GB8567--88, we learned specification writing software related to the specification, in this work, we have four clear division of labor, everyone is dedicated to their task, seriously, we work together and help each other , let us also understand the benefits of teamwork.