Teamwork fifth - Project sprint -Day7

Day7


part1-SCRUM:

Project-related

Job-related specific description
Belongs to the class 2019 Autumn Tai Fook practice of software engineering class Z
Work requirements Teamwork fifth - Project sprint
Text of the job hunter-- sprint collection
Team Name hunter team
Jobs goal Finally made a molding of hunter software can use to market is our ultimate goal

Text of the job

Today's schedule:

Names of Members Today's situation Tomorrow Plan
mission accomplished Time-consuming / h Problems encountered Remaining time / day
Qiu Jianqiang Between the page jump to solve the problem, and the completion of the independent hardware match function 7 Back to back-end unsuccessful 0 Perfect code modules
Chen Cong No real progress 7 Listen to organizational arrangements, red 0 Read data work to improve
Chun-Chieh Wu Page on the server to achieve the jump, interact with the hardware interface match 6 json. parse use problems 0 After the rear end of data transfer implemented with a front end jump page data
Shen Yi-huang Use before and after the end of the page jump Ajax 7 Coding 5 minutes, debug two hours 0 Integrate
Linzhi Full Is completed and results data received from the front end to complete the hardware matching algorithm 6 Json received front-end can not be resolved 0 Complete match keyword matching hardware interface data to each other
Li Qingyu Achieve a backend database call data transmitted from the front end interface 7 Jump between open from springboot page 0 Jump to resolve problems between pages
Boxwood dragon Assist preparation of the front and rear end portion of the interface code 6 No need to add some originally designed interfaces 0 To continue its activities today
Jiang Haitian no progress 5 So hard ah, a lot of things are not 0 Assist dalao, teapot
Zhu Yu Zhe Find the hard drive and motherboard 4 Information can not be very many miscellaneous centralized collection 0 Other accessories complete information
  • Check the progress of the code recorded as follows:

  • Part of the code screenshots

Additional links: hardware knowledge

  • Screenshots:
    knowledge of the hardware interface

  • Photo SCRUM meetings of a
    hunter group membership component diligent today, defying the difficult conditions persist in the end!

part2-PM Report ::

PM Report:

  • The entire project is expected to amount task, has spent time, remaining time

    Task expected volume / h Time already spent / h Remaining time / h
    73 61 12

  • Burndown
    task quantity units:

In units of time:

  • Draw a "total change of mission line"

  • Tabular form than the contribution of each member

    Names of Members Contribution ratio /%
    Qiu Jianqiang 13
    Li Qingyu 10
    Boxwood dragon 9
    Shen Yi-huang 10
    Linzhi Full 11
    Zhu Yu Zhe 6
    Ah say Aga 10
    Chen Cong 10
    Jiang Haitian 8
    Chun-Chieh Wu 13

Guess you like

Origin www.cnblogs.com/hunter-group/p/11846012.html