"Hairline and I always make the team," the fifth job: project needs analysis and system design improvements

project content
This work belongs courses Software Engineering
Where this requirement in the job Teamwork 5: Team project needs improvement and system design
Team Name The sum of my hairline Task Force
Job learning objectives 1. Write a complete "software requirements specification" 2. 3 learn to use drawing tools to complete the project needs analysis improved summary

Task I. team to improve project needs analysis

  • 1. The project team needs analysis to improve the
    "Northwest Normal University textbook ordering system project requirements specifications" have been revised and improved and upload
  • 8.5 Location Function Reference 2. "Construction of Law" and priority is given four quadrants functional analysis.
  • 3. Develop team project WBS


  • 4. Team members estimate the time required for each task in this blog
team member Division of work Time required
Jiang Jiayu Background Design Four weeks
Zhou Ting Background Design Four weeks
Zhao Jinying Front-end interface design Three weeks
Ye Hong Database Design Three weeks
Wang Tianyue test Two weeks

Task II. Project Design Team

  • 1. The overall design
  • 2.WBS tree
  • 3. The total ER diagram

Task three. "Software outline design specification"

View "software outline design specification"

Task four. Team division with specific feelings and experiences

  • 1. Division
project members Specific tasks The proportion of work
Jiang Jiayu System modeling, preparation of the WBS, the logical database design 20%
Zhou Ting Improve and organize the requirements specification, system architecture drawing 20%
Ye Hong System-level design book, blog writing 20%
Zhao Jinying System-level design book, blog writing 20%
Wang Tianyue System-level design book, blog writing 20%
  • 2. The experiences
    of this project is mainly lack of project requirements prior to analysis, and learning software system architecture and database logic design. When we realized that due to the insufficient analysis of all the programming uneven level before have not done similar work, leading to the slow progress in the project to work, the work will be found before now see there are a lot of mistakes, need to continue to improve. Through a lesson on the teacher to explain, when we realized that we only prior to user needs research method survey is not comprehensive enough, the research object is also more limited. We need to analyze user research, comprehensive selection, reasonable research object and using a variety of research methods, research finally get a reasonable result. The project we learn, to perfect on the original software, all reasonable division of labor, the project will be divided and detailed design, exercise everyone's ability to cooperate and improve efficiency.