一种A型桥塔的APDL建模命令流

Finish

/clear

/batch

/title,Theprocess of creating a tower of concrete cable-stayed bridge modeling

/filename,atower of concrete cable-stayed bridge

/batch

 

/input,menust,tmp

*set,L1,98,19

*set,L2,2.54

*set,L3,42

*set,L4,4.04

*set,L5,48.16

*set,L6,1.42

*set,L7,5.16

*set,L8,18.18

*set,L9,20.48

*set,a,80°

*set,Q,5

*set,C,3

*set,M,7

 

/prep7

*dim,towd,96.8,11

et,1,solid65

mp,ex,1,6.84e10

mp,prxy,1,0.2

r,1,0,1e3

DIST,L1,98.19

DIST,L2,2.54

DIST,L3,42

DIST,L4,4.04

DIST,L5,48.16

DIST,L6,1.42

DIST,L7,5.16

DIST,L8,18.18

DIST,L9,20.48

Angle,a,80°

K,1,0,0,0

K,2,3.25,0,0

K,3,34.79,0,0

K,4,38.04,0,0

K,5,10.28,0,41.4

K,6,27.76,0,41.4

K,7,27.08,0,45.4

K,8,10.96,0,45.4

K,9,19.02,0,93.13

K,10,21.6,0,96.8

K,11,16.44,0,96.8

LSTR,1,2

LSTR,2,5

LSTR,5,6

LSTR,6,3

LSTR,3,4

LSTR,4,10

LSTR,10,11

LSTR,11,7

LSTR,7,8

LSTR,8,9

LSTR,9,7

AL,1,2,3,4,5,6,10,11

AL,7,8,9

ASBA,1,2

K,12,0,10,0

LSTR,1,12

VDRAG,ALL,,,,,,12

 

ESIZE,1,0

AMESH,1

 

 