Software Engineering major operations - the sixth group - Second meeting

[TOC]

Related Links

Conference record

  • Meeting time 2019-11-26
  • Location manager four -222
  • Participants: Zheng Shi Yu, Wangqiu Hong, Luoling Jie Zheng Ke also

Conference Theme

  • Summarizes progress on the phase of the task

  • On to the next phase of the task assignment

Conference content

Summarizes progress on the phase of the task

  • Last task allocation review
Full name student ID Preliminary task Follow-up mission
Luo Lingjie 31701003 Fill in the initial database (MySQL) to establish and data Students realize the method associated with three classes and methods 11
Wangqiu Hong 31701004 Further improve the front end Notify the relevant field three classes and 12 active methods of method implementation
Zheng Shi Yu 31701005 Framework of the establishment of Java classes and methods Associations method to achieve two related classes and methods containing 9
Zheng Ke also 31701373 Front and rear ends connected to the server and to build Learning and implement methods and structures implemented method of connecting portions

Preliminary tasks DEADLINE 11.20 18:00 timely completion of follow-up task DEADLINE 11.24.23: 00 completed on time

The specific time to complete and upload the situation can be seen github submit records

  • The current schedule has been drawn to complete a timing diagram of the method, the dynamic part of the only complete login and show the students' Organizations

While the time to complete the task, but according to feedback, task progress on the lessons behind other groups, so this week to be pushing ahead with the main quest .

Before Performance Summary

  • Timely completion of their task before the deadline
  • But did not co-ordinate the overall good of the progress of the task, the completion of the prototype week schedule, behind other groups, pay close attention to catch up.
  • Last design job submission, compared with other excellent group, we write a set of documents, some lack enough detailed and perfect, after the document needs to be improved.

On to the next phase of the task assignment

The current UI incomplete, administrator and president of the interface is not yet perfect, and some method to extract data from the database is still missing UI needs, too little data database, you need to add.

  • The main objective of improving activities related to the functions and ui
  • Task Assignment
    • Perfect Luo Lingjie static pages need to improve the administrator's interface consists of: go Approval page (no search box line by line approval message, point into view) community list (line by line to increase community button) to increase site (Site button to delete the line by line button to modify the site site info button)
    • Perfect perfect president of Wangqiu Hong interface includes static Web pages: Delete announcement announcement announcement event announcements modify (to participate in activities button) to cancel activities increased activity modification activity information society (to participate in society)
    • Zheng Ke also build dynamic web connection, add an event, review theme, announcement, join the activities, personnel audits and other methods
    • Delete perfect community Zheng Shi Yu remaining class methods and databases to return members to return to approval activities, the president judge, the theme of the field to add and modify, add and modify auditing transmission time, encrypted database password fields

deadline 12.2 18:00