The second meeting of the Soft Workers Group

When: April 23, 2018

Location: Hui Thirteen


Participants: Gao Xueling, Li Jianuo, Wu Yue, Zhang Jiahui, Ren Bianxia
      
      In this meeting, we mainly discussed the division of labor based on demand analysis. However, because each piece of the project is related, it cannot be completely separated. Therefore, our division of labor only clarifies the content that each is mainly responsible for.

        
               The following supplements the division of labor described in the needs analysis:
                1. Introduction and Constraints (Ren Bianxia)
                2. System Definition and Operating Environment (Li Jianuo)
                3. Data Description (Wu Yue)
                4. Functional Requirements and Operational Requirements (Gao Xueling)
                5. Performance Requirements and Other Requirements (Zhang Jiahui)

Guess you like

Origin http://43.154.161.224:23101/article/api/json?id=324812526&siteId=291194637