Jiang Yifan second job

First, the customer requires
 
1. customers for software development projects probably required;
2. My company sent onsite software presentations, understand the needs;
3. To provide relevant information (such as: graphical, text, report formats, etc.).
 
Second, to provide "solutions and offer
 all of our needs a detailed analysis of customer requests (including: software and hardware requirements);
 2. According to customer requirements, write" software development project solutions ";
 3. Assess the workload, write "software development projects offer" document.
Third, customer advance payment
 1. The two sides signed a development contract, customers pay advances in software development;
 2. Our organization development team, the development of the development plan.
 
Fourth, the prototype design
 
prototype design will resemble a sketch APP customized products, after analyzing through the depth of the user, will sort out the demand classify, sort functional modules Festival, the use of these modules will be able to build a simple function the prototype. The prototype demonstrated the basic functional structure, with the prototype design software to simulate similar to APP products and customers for confirmation, final confirmation of the results is completed, into the next part.
 
Fifth, customer design review and confirm
 1 customer review system processes and functions;
 2. Customer propose amendments, our developers documenting according to the views of customers;
 3. Confirm software functional details in writing and handed over customer signature;
Sixth, begin Software Development:
 1. Our company based on the customer to confirm the development of the document, start project development;
 2. Simultaneously start debugging hardware and network equipment, operator training and basic knowledge of computers;
 3. the actual situation, some modules can be arranged on-line implementation;
 4. in the development process, the two sides have completed the review of the function, to correct deviations in the development process;
 5. constantly adding new modules scope;
 
seven test
 the interface and features about the connection, App developed roughly demo came out, demo and trial himself after the experience several times, according to the practical situation, after no big mistakes, the new version can try to find beta users, according to the test user feedback, improve and repeatedly tested. User testing phase must take into account the views of each user, not every opinion will be adopted, but do not let a little flaw, make every effort to make their work better.
 
Eight, project acceptance:
 1. The implementation of the completion of each module system, and to ensure the smooth operation of the system;
 2. acceptance according to the contract the two sides;
 3. in the acceptance process, the disputed areas, in line with the principles of friendly consultation;
 4. acceptance, signed "project acceptance report" by both parties
 
nine, uploaded to the app store
 after completing the signature verification, develop good client APP program can submit applications to publish to each store. iOS version of the APP submitted to the Apple AppStore, Android submitted to major domestic Android application store.
 
Ten, APP maintenance and updating
 maintenance of APP after on-line, collect user feedback, timely fix errors (Bug) APP application arise. So, what are the specific post-maintenance operations include?
 1. The major market application developers account maintenance, such as updating pea pods, Andrews market, wood ants, 360 Market and other developer account maintenance Apple Store, Android system ios system.
2. The analysis of feedback and data products, the next version of the update, feature upgrades, such as adding sections according to the user after the first version of the app on the line. Here a complete APP was developed, from the initial needs analysis to communicate to the final APP test the modified line, the entire APP's life cycle can not escape from the needs of users, because an even user does not recognize, not practical APP, only It will go sour.

Guess you like