Team project - System Design

Team Design - System Design

This work belongs courses https://edu.cnblogs.com/campus/xnsy/GeographicInformationScience/
Where the job requires https://www.cnblogs.com/harry240/p/11524148.html
Team Name Luck King Raid
The target job Good theoretical and practical basis for the realization of software, familiar with the process, in order to improve efficiency

Student ID list 1. Team members

Ho Chen Rui (Leader) 201731024227
Liu Jun 201731024208
Jiang Instrument 201731024206
Kuangxiao Juan 201731024210
Wu Mingyi 201731024202
Tu was Sen 201731024129
Ray Penang source 201731024116

2. The stage of the division of tasks case

Prototyping and co-ordinate arrangements Ho Chen Rui
Needs analysis section Wu Mingyi, Liu Jun
Detailed design and preliminary design section Ray Penang source, was painted forest
Database Design section Kuangxiao Juan, ginger instrument

3. Summary of design

1) Software Architecture
Here Insert Picture Description
2) The main service module description
1. System landing module
| Module Name | landing module system |
| - | - |
| Enter | user name, password |
| output | successful landing and the user's role
| function Description | implement user security login and user roles expressed landing |

2. system interface module
| Module Name | System Interface Modules |
| - | - |
| Input | click function module |
| Output | into the functional blocks
| Function | attendance system to achieve multi-functional |

3. Attendance functional modules
| Module Name | Attendance functional modules |
| - | - |
| input | two-dimensional code, sign code, school number or job number (teachers, managers input, etc.) |
| Output | sign in or sign success failed |
| function | attendance method to achieve diversity, administrators can not sign the initiative to achieve a successful team members sign |

4. Attendance query module
| Module Name | Attendance query module |
| - | - |
| input | time and student number (staff) |
| output | displays search results |
| Function | achieve the user's time and attendance information query

4. Database Design

1) conceptual model

Here Insert Picture Description
2) logic model

Here Insert Picture Description
Here Insert Picture Description

5. The next phase of detailed work plan

  • Upon completion of the initial prototype software design, database design, and detail, and then outline design, the back is the longest of the implementation phase of the deployment, we need to learn to write code, database optimization and security design, each module of the software to achieve cohesion between the high and low coupling, and the UI code for interfacing software, software development learning API usage.

    6. The next phase of the division of tasks

    The division of tasks student ID
    The overall planning and arrangements, periodic summary work 201731024227
    Program design and code implementation 201731024129、201731024116
    UI design and optimization to help improve the database 201731024208、201731024202
    Database Design and Optimization 201731024206、201731024210

Guess you like

Origin www.cnblogs.com/hechenrui98/p/11666853.html