Chapter 2 Section 2 Work Calendar

Section 2 Work Calendar

1. The basic definition
in UFIDA U8 is "planned renewal" is an implicit concept. The planned renewal is calculated based on the current date of the computer, the deadline (set in Figure 5-3), and the demand date in the effective product forecast order.
Menu path: basic settings-basic files-business-work calendar maintenance.
The work calendar refers to the number of days that the production workshop starts in a time period, and the time period to start work in a day.
In this case, we define the period from March 1, 2019 to December 31, 2019, and Monday to Friday are working days. The working hours within a day are 08:00-12:00 and 13:00-17:30. The
actual work calendar should also exclude legal holidays, such as 7-day holidays and adjustments for National Day.

2. Newly added calendar
Chapter 2 Section 2 Work Calendar
Picture 2-6
Picture 2-6 The new button at point 1, pop-up interface:
Chapter 2 Section 2 Work Calendar
Picture
2-7 Enter the calendar code USER01, start time and description at 1 in Picture 2-7. Tick ​​Monday to Friday in place 2, and in place 3, tick the check box in front of the time, and then set the start and end time 08:00-12:00. After entering one line, press Enter and enter the second line 13 :00 to 17:00. Confirm to return to the previous interface.

3. For holiday adjustment
, first clear the data in place 1 in Figure 2-8, and then click the reference button at place 1. After the basic reference of the working calendar pops up, select USER01 at place 2 and confirm to return.
Chapter 2 Section 2 Work Calendar
Figure
2-8 is modified at point 1 in Figure 2-9, and the work calendar maintenance interface pops up. Assuming that 2019-03-29 to 2019-03-31 is Qingming Festival, the legal holiday is 3 days. Set the time period in 2 places in Figure 2-9, check the coverage of 3 places, and all 4 places are cleared. OK to return.
Chapter 2 Section 2 Work Calendar
Figure
2-9 This Ching Ming Festival holiday took up the working day 2019-03-29, adjusted to 2019-04-07 to supplement. Click the "modify" button at place 1 in Figure 2-9 again, and Figure 2-10 appears. Perform adjustment operations as shown: both the start and end dates are set to 2019-04-07, the day is "Sunday", and the "No Override" to set the commuting time. OK to return.
Chapter 2 Section 2 Work Calendar
Figure 2-10

4. SYSTEM calendar
SYSTEM calendar must be set, otherwise it will affect subsequent business operations. This case is defined as: "2019-1-1 to 2019-12-31, every Monday to Friday, 8:00 to 17:00", the modification method is the same as above.