[2020BUAA soft engineering assistant] weekly summary assistant (week 5)

2020-03-29 Summary assistant one week (fifth week)

1, TA blog links: https://www.cnblogs.com/jeffan/
2, this week, the number of jobs Comments: 0 (according to assistant scheduling table, without my review task this week)

3 this week, scores of job link: Pair job

4, the main tasks this week:

  • After the project team [selection] were golden point game in each team, to calculate the outcome of the game. At the same time according to the team project to select the job selection rules projects, organizations, and urged each team project selection.
  • [] Tasks assigned ratings for the week ended two jobs of twinning work and analysis of case work , participated in the development of scoring rules, corresponding to the division of tasks and scheduling assistant.
  • [Ratings] control scoring rules, to knot the job blog work of the 21 were scored.

5 this week found problems and solutions:

  • Select team on the project, there are many students whisper I did some consulting. This concludes the rules of our team project selection to be followed, the next will be to improve the operational requirements of these rules:

    • Our job description is:

    A total of 13 student teams, there are six alternative projects, there are at least 6 teams to choose from alternative projects in each of the selected alternative projects up to a team , 7 teams can be chosen project, you can choose an alternative project.

    Order of discharge by golden point game selection.

    • The selection rule can be summarized as follows:
      • When the A team wants to select alternative projects x, provided that the front of the team did not choose alternative project x.
      • When the A team wants to do when designing a new project, with the proviso that, left_team> = left_proj-1, which left_teamis the number of A team behind the team, left_projthe number of alternative projects has not yet been selected.
    • About whether optional items are restrictions: no optional items specific restrictions, but the group will review the curriculum (mainly in terms of workload and demand), sometimes we give some suggestions (for example, feel that your workload is too few would suggest you add some features)
    • Is there a limit when the deployment environment demonstration projects: The demonstration project is to enable everyone in the classroom to talk about the team's project demonstrates blog, so there is no limit deployment environment.
  • Team project selection process is quite long, especially after the team ranked by the need to wait in front of the team and then select After selecting a project, so the next team project selection may consider increasing the time for a job.

Guess you like

Origin www.cnblogs.com/jeffan/p/12595959.html