Job Description
SCRUM part
Today, members describe progress
Code is checked into the record
SCRUM meetings photos.
(Since the return to class every day, not unified operation, after the discussion back to their regular work schedule time)
Project Screenshots
PM report
1. The project is expected workload
The total time required for the task |
192h |
Long time has been spent |
127h |
Expected time remaining |
65h |
2. burndown
2.1 burndown sheet calculated by task:
2.2 burndown time basis:
3. The total amount of tasks change map
4. Members contribution ratio
Lin Dehui |
031702142 |
% |
Ye Xin Yan |
031702108 |
% |
Pengwen Ze |
031702140 |
% |
Zhang Chengde |
031702130 |
% |
Wang Qian Ting |
031702101 |
% |
Wang Yu |
031702409 |
% |
He Yunpeng |
031702327 |
% |
Lizhong Jin |
031402112 |
% |