[Little Fortunes bbs- sprint log (the seventh day)]
This work belongs courses | Class Links |
---|---|
Where the job requires | Link job requirements |
Team Name | Little Fortunes bbs |
The target job | Most of the back-end to complete the function operation, front-end UI to complete most of the functionality test |
Text jobs | Little Fortunes bbs- sprint log (the seventh day) |
Other references | Zou Yan teacher for Baidu and "building law" |
A. SCRUM part
(1) Schedule
Names of Members | Today's schedule | waste time | Tomorrow Plan |
---|---|---|---|
Malian Zheng | Posts static data storage | 4h | Post completion of the static publishing, page parameters are passed |
Hu Qingshou | Optimize code layout, and then look at the various interfaces and have no problem jumping | 2h | advanced optimization |
Wu Sihuan | |||
Liu Qinghong | Achieve a static data-bound pages, post messages on posts | 1.5h | Build, optimize posting |
Wang Zhenxiong | 3h | ||
River house boat | Write a blog and understand the documentation and testing operations | 4h | Write daily blog |
Yang Cheng Jin | Learn to configure Ali cloud server | 7h | Try to build server |
Cai Shao Fan | Continue to try to save content to publish articles on their computer database, it has been the emergence of a bug not resolved | 5h | Solve the bug that occurs when uploading |
(2) check codes recorded
Photos (3) SCRUM meetings of a
Two. PM report
(1)
The entire project is expected to amount of tasks | Now spend time | Remaining time |
---|---|---|
120h | 110h | 10h |
(2) burndown
(3) Draw a "total change task line."
(4) than the contribution of each member
Members of the Student ID | Names of Members | Contribution ratio |
---|---|---|
031702145 | Malian Zheng | 13% |
031702125 | Hu Qingshou | 13% |
031702349 | Wu Sihuan | |
031702129 | Liu Qinghong | 15% |
031702248 | Wang Zhenxiong | 14% |
031702132 | River house boat | 15% |
031702243 | Yang Cheng Jin | 15% |
031702131 | Cai Shao Fan | 15% |