Job Description
SCRUM part
Today, members describe progress
Code is checked into the record
issues:
SCRUM meetings Photo
Project Screenshots
PM report
1. The project is expected workload
The total time required for the task |
192h |
Long time has been spent |
|
Expected time remaining |
|
2. burndown
2.1 burndown sheet calculated by task:
2.2 burndown time basis:
3. The total amount of tasks change map
4. Members contribution ratio
Lin Dehui |
031702142 |
% |
Ye Xin Yan |
031702108 |
% |
Pengwen Ze |
031702140 |
% |
Zhang Chengde |
031702130 |
% |
Wang Qian Ting |
031702101 |
% |
Wang Yu |
031702409 |
% |
He Yunpeng |
031702327 |
% |
Lizhong Jin |
031402112 |
% |