Day 7 Agility Sprint

1. Photos of the day's stand-up meeting

2. Everyone's job

The work completed yesterday:
1) Completed the design of the prompt interface
2) The sql connection was basically completed, trying to be called by other classes
3) The "correct rate" interface and the coding of the generated game were completed

The work planned to be completed today:
1) Complete the design of the answer analysis interface
2) The database is basically completed
3) Complete the "answer analysis" interface and the coding of the generated game

Difficulties encountered at work:

Because I was preparing for the exam and reviewing yesterday, the time for doing the experiment was reduced, and the report was postponed until today. Continue this piece tomorrow.

3. Project Burndown Chart

4. Each person's code/document check-in record