Teamwork Beta sprint
project | content |
---|---|
This work belongs courses | Classroom teachers blog home page link |
Where this requirement in the job | Job link address |
Team Name | You are the devil do |
Job learning objectives | (1) master the software black box testing; (2) learn to prepare software project summary PPT, project acceptance report; (3) the content control software project acceptance, and acceptance process. |
Foreword
The next day sprint meeting
Location: Campus dormitory, Building 7217
Time: 2019.6.25 9:00
Team project github repository address link
https://github.com/201671010451/shiyanqi
Task Assignment
After the Alpha project team sprint stage, the project has been basically completed coding. Enter the Beta phase
After the sprint, developers need to use from the user experience or typical user scenarios to test and improve the system, this time, the common black-box technology to complete the testing.
Full name | The current phase of the task | The next phase of the task |
---|---|---|
Jiao Shaomei | Complete the first phase encoding deployment, learning software black box testing, test run login, logout module | To log in and out again to improve detection and analysis module |
Yang Zhixiao | Learning software black box testing, test run income module | Income module is again improving detection analysis |
Wang Yu Zhu | Learning software black box testing, test runs expenditure module | Expenditure analysis module detects sound again |
Wang Yi Han | Learning software black box testing, test run integrated module | Comprehensive analysis to improve the detection module again |
Today, the number of hours of contribution of each member of the project
member | The number of hours contributed |
---|---|
Jiao Shaomei | 4h |
Yang Zhixiao | 4h |
Wang Yu Zhu | 4h |
Wang Yi Han | 4h |