project | content |
---|---|
This work belongs courses | Classroom teachers blog home page link |
Where this requirement in the job | Job link address |
Team Name | Code team does not knock |
Job learning objectives | (1) the improvement and consolidation project documentation; (2) the team project summary statement PPT preparation; (3) in line with the preparation of the team project characteristics of the project approval opinion tables; (4) the completion of the project software preparatory work before the system demonstration, confirmed twinning acceptance the project team; agenda list (5) the preparation of the meeting acceptance and acceptance of meetings. |
Day Date: 2019/6/25
• Team project github repository address link
GitHub repository address link
• Each member of the task today
Full name | task |
---|---|
Yu Wenxi | System implementation, code optimization |
Han Yanyan | Improve the system design and detailed design |
Denghai Xiang | Edit blog |
White Dragon flying | Prepared in accordance with the characteristics of the project team of project acceptance table views |
•problem
1. In the discovery of how much Bug? What is Bug Alpha phase is not found?
2. How to test user scenarios (scenario testing) of?
3. Is there a regression testing? Give one or two test cases and explain.
4. What kind of projects are given platform, hardware configuration, test the software on browser type ......?
• The number of hours each member's contribution to the project today
Full name | Time / h | Accounting for the proportion of the workload of the entire job tasks |
---|---|---|
Yu Wenxi | 3 | 25% |
Han Yanyan | 3 | 25% |
Denghai Xiang | 3 | 25% |
White Dragon flying | 3 | 25% |