2 sprint team project -Beta

Blog introduction
This work belongs courses https://edu.cnblogs.com/campus/xnsy/GeographicInformationScience
Where the job requires https://www.cnblogs.com/harry240/p/11524196.html
Team Name RainbowPlan
The target job Beta stage sprint 2/3

1. Time:
2019.11.26 Tuesday
2. Content:
2.1 New Collection page editing ability to modify, delete data and can be modified by:
Update

Update
2.2 Modifications Modifications and UI optimization temporary data storage mode:
slide whether they should get a new word count by about judgment:
Slide optimization
the queue structure directly with the Word page storage:
Queue Optimization
updating UI Favorite function to make updates:
CollectUI
2.3 Share screenshot function optimization: solve screen scaling problem: judging by the size of the zoom to adjust the location shots, shots in the correct position to achieve the effect.
截图优化

3. Estimated:
this stage has been basically completed all optimization, will be back to check again.
The next stage: software package and experience to test, plug statistical problems when individual experiments personnel.
4. Estimated completion:
燃尽图
version 5.Beta2 Download and description:
Links: https://pan.baidu.com/s/1ahjVDjizwbwGVovyijfXTA
extraction code: v96x
Description: The software has been packaged into application software, refer to "explain" ;
安装
6. summary 2:
completed software, and complete all the work into use test maintenance process.