IDC room some advice on self evaluation materials

IDC room on comprehensive evaluation self evaluation, simply put, is relevant ministries to conduct self-built room in the property, fire resistance rating of the engine room, floor loads, seismic level, fire, power distribution, security management, operating systems, evaluation by, after reaching conditions, companies can operate outside. So, what material self IDC room evaluation need to prepare it?

1, IDC venue certificates of title;

2, bandwidth leasing undertaking;

3, building design documents on the engine room fire rating;

4, building design documents on the floor load of the engine room;

5, architectural design documents on the seismic rating of the engine room;

6, the engine room fire inspection report or fire record sheet;

7, IDC rental contract / agreement (lease only non-base operators need to provide housing opportunities);

8, the lessor IDC business qualification material (for hire only need to provide basic non-operating business room);

9, each of the room floor plan design;

10, high-voltage electric power distribution cabinet sector label affixed to the power supply system simulation screen photos or pictures;

11, mains or the introduction of project design documents issued by the Power Supply Bureau Supply Scheme;

12, generator sets scene photos;

13, generator nameplate photographs;

14, mains line counters mine photo;

15, UPS output surge protector cabinet photograph;

16, counter the first equipped with surge protectors photos;

17, diesel fuel container on-site photo □ the strength of electrical bridge design;

18, the strength of electrical bridge scene photos;

19, counter the first to introduce dual-circuit power distribution scene photos;

20, IDC network topology;

21, the video surveillance system bitmaps;

22, access control system bitmaps;

23, USMS system monitor screen shots of the power supply system (e.g., high and low voltage distribution cabinets, transformers, etc.);

24, USMS system UPS monitoring screen shots;

25, the USMS system of the air conditioning system monitor screen shots;

26, the USMS system to monitor the temperature and relative humidity of the room or site Screenshots hygrometer photographs;

27, fire control platform host photos.

As mentioned above, the engine room to run all aspects of the evaluation need to prepare as many as 20 instructions and materials, and often after the completion of the engine room, the correction would be more difficult to do. For example, procurement ring system how to deploy, how to solve the problem of power distribution room, whether there are buildings and load-bearing property issues, whether the room is not conducive to waterproof buildings and other issues such as the bottom or top.

Also note that not all enterprises to apply for a license should be self IDC engine room operational safety review, if companies do not have self-built room, but only leased telecommunications operator China Unicom and other basic equipment room, there is no need for cumbersome room evaluation, required to submit only a small amount of server hosting contracts and other material to the safe operation of the engine room through evaluation.