182 million Nansha District "digital city" urban operation center construction project procurement demand

1. General Technical Requirements

overall framework of the project

Following the overall structure of "one center, two middle platforms, and the foundation base", build the urban governance center of the whole region to realize the functions of connecting up and down, connecting left and right, distribution and disposal, and coordinated command.

The overall structure of the project system is divided into five parts: a center, two middle platforms, and a basic base. Based on the work of the government cloud platform, the overall perception, analysis and judgment, decision-making assistance, and coordinated command of the system will be further enhanced to consolidate commonality. Supporting capabilities provide the basic foundation and capability support for the digital city in Nansha District. At the same time, through data collection and information exchange, data exchange is realized with external platforms and systems, and urban operation index data is gathered and shared.

Internal data flow and collaboration. Users access the operation center and capability center through the integrated support platform, highlighting the supporting role of the integrated support platform; the capability center and city operation center will share and aggregate the data generated into the data center to form a data theme database and a thematic database. As the data base of the city operation center and the capability center, the data center provides necessary data to each application platform; at the same time, the capability center and the data center provide empowerment to the city operation center.

picture

Figure - overall frame diagram

(1) a center

Build Nansha city operation center. With the continuous advancement of the construction of "digital city", the development of digital city in Nansha District gradually presents a series of new stage features. In order to meet the needs of "digital city" in the new era, the construction ideas, operation modes and technical means There is an urgent need for all-round iterative upgrades. The city operation center is one of the core elements of digital city construction, the core infrastructure of digital city, and has become the core carrier of digital city construction at this stage. Further strengthen data integration, platform integration, capability integration, and real-time linkage. Based on operation monitoring, decision-making assistance, command dispatch, and town-street collaboration platforms, create an advanced and practical urban operation center with wide coverage, and improve urban management and operation level and command Scheduling ability, give full play to the role of the "central nerve" of the modern command center for regional governance, improve the departmental linkage and coordination mechanism, analyze and judge information in a timely manner, and supervise the handling of the meeting to form a closed loop for finding and solving problems, and strive to build a social governance system and governance in Nansha Capability modernization benchmark.

(2) Two major middle stations

Build a capability center and a data center. Build an integrated support platform to support the digital center and capability center. The data center does not consider the construction content in this period (the specific construction will be carried out according to the project policy document), and the capability center includes the empowerment service portal, digital intelligence empowerment gateway, and capability There are 4 parts including middle platform development and capability encapsulation platform; build a unified empowerment service portal. For the use and management of service capabilities, build a unified empowerment service portal around service registration, service publishing, service management, service query, service subscription, service guidance, user management and other service usage capabilities to assist service providers and service consumers The use and management of ability service requirements, to achieve the goal of convenient acquisition of service capabilities and orderly management; build a digital intelligence "digital intelligence empowerment" gateway. For service capability calls, from the perspectives of service capability security, service intensive capability, and overall performance balance; construct a "digital intelligence empowerment" gateway to provide capabilities such as service routing, traffic monitoring, protocol conversion, load balancing, service authentication, and health monitoring , to provide a standard, common, and feasible open method for intensive capacity sharing and sharing, and to realize the security and health monitoring of the whole process of service capacity call access, and to provide efficient and stable operation guarantee for service capacity call; the construction includes map mobile collection, CIM micro-service, Integrate 7 major platforms and capability packages including communication platform, artificial intelligence, Internet of Things platform, public basic service platform, and knowledge graph.

(3) Foundation base

The construction includes the urban transportation center and cloud platform expansion and computer room relocation projects. The urban transportation center includes 10 systems including integrated wiring system, large-screen display system, video conference system, sound reinforcement system, digital conference system, electronic table card system, distributed integrated dispatching system, computer room network system, command console, etc. The capacity expansion and computer room relocation project includes the adjustment of the existing computer room, the relocation of computer room equipment, and the expansion of the cloud. The construction includes government cloud expansion, domestic clusters, computer room relocation, network and security, and other equipment.

(4) Four guarantee systems

The four guarantee systems include standard specification system, operation management system, safety guarantee system, and operation guarantee system. The standard system includes various management standards and construction standards; the operation management system includes operation standards; the security system includes safety standards. The operation guarantee system includes regular inspection, performance optimization, software upgrade, key guarantee, basic environment operation and maintenance, application system operation and maintenance, equipment maintenance, product manufacturer coordination service, spare parts service, third-party interface technical support, technical consultation, prevention permanent maintenance, emergency support services, etc.

system structure

The overall functional structure of this project is as follows:

picture

Figure - overall functional architecture

The functional structure of this project includes functions such as urban transportation center, cloud platform expansion and computer room relocation, capability middle platform, integrated support platform, and operation center.

The urban transportation center includes 6 functions including large-screen display system, video conferencing system, digital conference system, sound reinforcement system, and other systems; cloud platform expansion and computer room relocation include network and security, government affairs cloud, domestic clusters, and computer room relocation. Functions; the capability center includes three functions: the enabling service portal, the "digital intelligence empowerment" gateway, and the capability system; the integrated support platform includes eight functions including a unified identity authentication platform; the operation center includes operation monitoring, decision-making assistance, and command There are 4 functions including dispatching and town-street coordination.

1.1.1. "Digital Nansha" urban transportation hub

1.1.1.1. Overview of System Requirements

As an important functional module of the region's comprehensive urban governance, the Digital Nansha Urban Operation Center explores the integration and interaction of digital twins and urban data to realize the digitization and virtualization of urban elements and the synergy and intelligence of urban management decision-making. With the operation monitoring platform as the center, it is integrated with decision-making assistance, command and dispatch, and town-street collaboration platforms. Make full use of the results of the region's informatization construction, gather and integrate data scattered in various bureaus and business systems in the region, and use cutting-edge technologies such as big data, cloud computing, and artificial intelligence to build a city's "nerve center", so as to realize the The city's real-time global perception, comprehensive display, precise analysis, overall research and judgment, and coordinated command provide "energy" for the application of informatization in the region, realize cross-field collaborative linkage support, and gradually form a harmonious, unified, and intensively shared informatization ecology.

▲The bidder has the ability to research and develop relevant systems related to comprehensive urban management display, and has the independent intellectual property rights of "comprehensive urban management display". The software copyright registration certificate containing the words "comprehensive display of urban management" obtained by the bidder must be provided.

▲The bidder has the independent research and development capabilities of the digital twin visualization platform, and has the independent intellectual property rights of "digital twin management". The software copyright registration certificate containing the words "digital twin management" obtained by the bidder must be provided.

1.1.1.2. System functional requirements

1.1.1.2.1. Application entry

The application portal takes the comprehensive entrance of Nansha city operation as the core. Through the construction of large-screen terminal, PC terminal and mobile terminal, a unified comprehensive portal for government affairs coordination is formed, and the linkage display of both ends (PC terminal and mobile terminal) of one screen (big screen) is realized. with application.

▲The bidder has the independent research and development capabilities of the application portal and integrated portal, and has the independent intellectual property rights of the "application integrated portal". The software copyright registration certificate containing the words "application integration portal" obtained by the bidder must be provided.

1.1.1.2.1.1. Large screen terminal

The large-screen terminal of the digital Nansha urban transportation center is mainly used in the command center, and it is aimed at district leaders, urban operation management departments and related business departments, focusing on the analysis and application of economic operation in Nansha District, key themes (operation monitoring, urban governance, public services, In the fields of digital economy, basic base, command and dispatch, and town-street coordination), build a large-screen display and application of the digital Nansha theme to quickly grasp the district-level urban operation overview, real-time indicator warning, resource overview, and rapid collaborative dispatch.

1.1.1.2.1.2. PC terminal

The PC terminal of the Digital Nansha Urban Operation Center is mainly used by the leading departments and responsible departments of various theme applications, focusing on the economic operation analysis application of Nansha District, key themes (operation monitoring, urban governance, public services, digital economy, foundation base, command and dispatch, town street In the field of collaboration), build a large-screen display and application of the theme of digital Nansha.

Based on the overall organizational structure, user system, authority control and other functions, the government departments of Nansha District can access related theme applications on the PC terminal according to their own business needs under the authority control requirements, and can jump to the corresponding large-screen application through the PC terminal application. At the same time, the business department can link to jump to or nest the page with the relevant business platform system, functional modules and business pages of the government department according to the actual needs of the business.

1.1.1.2.1.3. Mobile terminal

The Digital Nansha Urban Operation Center needs to develop APP applications based on Yuezhengyi, satisfying small programs, H5 page applications, etc. It is mainly used by leaders of Nansha District, leaders of various application leading departments, responsible department leaders and business personnel, focusing on economic operation analysis applications in Nansha District, In the fields of key themes (operation monitoring, urban governance, public services, digital economy, infrastructure, command and dispatch, and town-street coordination), build a large-screen display and application of the digital Nansha theme.

The mobile terminal of the digital Nansha urban transportation center needs to be based on the overall organizational structure, user system, authority control and other functions, so that the leaders and government departments of Nansha District can access the relevant topics and ability applications of the mobile terminal according to their own business needs under the authority control requirements.

1.1.1.1.1. Operation monitoring platform
1.1.1.1.1.1. Overview of Platform Requirements

By establishing an urban operation index and physical sign index system in line with the characteristics of Nansha District, and building an operation monitoring platform around key urban themes (operation monitoring, urban governance, public services, digital economy, infrastructure, command and dispatch, and town-street coordination), the district will realize Full perception and comprehensive display of urban operation. Supported by the data visualization application platform, it comprehensively applies technologies such as the Internet of Things, precise location services, and CIM, and expands through the display scene models in various fields. Broaden the channels of data collection, comprehensively integrate bureau system docking, network search, sensor collection, video surveillance collection and other methods to enhance the perceptibility of urban spatial elements. Realize the effective integration and organic integration of "business application"-oriented city runtime dynamic real-time indicators, physical signs indicators in the process of urban development, and administrative assessment indicators in the daily management of various committees, offices and bureaus. Gradually realize the transformation from passive management to active response, and improve the level of urban management decision-making and social services.

1.1.1.1.1.2. A graph of operation monitoring

1.1.1.1.1.2.1. Area Overview

Based on the global big data center, the population, area, administrative division, public facilities, commercial facilities, main economic indicators and party building indicators of Nansha District are displayed in chart form.

1.1.1.1.1.2.2. Economic operation

According to the overall analysis of the key economic indicators in the government work report, statistical yearbook, and statistical monthly report, it comprehensively and intuitively shows the economic development trend and overall operation status of Nansha. Including accurate analysis of corporate portraits and analysis of macroeconomic operating trends.

1.1.1.1.1.2.3. Port construction

For the passenger port, cargo port and fishing port in Nansha District, mainly focus on the number of passengers transported by the passenger port and the cargo throughput of the cargo port, the number of freight ships, the number of cargo ships in the port, the length of the cargo ships in the port, and the data of fishing boats entering and leaving the port, etc., in terms of quantity statistics and growth trends The development and growth trend of the port economy in Nansha District are displayed in dimensions such as year-on-year and quarter-on-quarter analysis.

1.1.1.1.1.2.4. Government services

The distribution of government service halls in Nansha District, the entry items, the number of appointments, the actual number of people received, the situation of personnel handling, the number of handling cases, popular service items, service satisfaction, administrative approval and other aspects comprehensively present the operation of government services, and provide a comprehensive overview of the operation of government services in the whole district. The construction and operation status of the government system will be comprehensively displayed, evaluated and improved.

1.1.1.1.1.2.5. Ecological environment

Integrate meteorological information, ecological environment, environmental pollution, natural disasters and other information resources to monitor and visually analyze meteorological conditions, natural resources, air quality, water quality, agriculture, forestry soil, pollution sources, meteorological disasters, geological disasters, forest fire prevention and other elements , to help managers monitor urban resources and environmental conditions in an all-round way.

1.1.1.1.1.2.6. Urban Governance

Construct urban governance sub-modules in one image of operation monitoring, rely on urban governance theme library model capabilities to empower application topics, focus on the overview and details of events in Nansha on that day or month, such as public security incidents, public police incidents, and public health incidents in the city , emergencies, etc., and display business data such as the number of completed events, completion rate, and accident loss statistics. Leaders can have a macroscopic understanding of the urban governance of Nansha District through the urban governance sub-module.

1.1.1.1.1.2.7. Organization portrait

Relying on big data and the whole network to collect government department data, using a variety of machine learning algorithms, using high-dimensional correlation and time series processing, to outline the holographic portrait of the government scene department, and to achieve the four goals of finding out the family background, accurate characterization, dynamic monitoring, and service decision-making.

1.1.1.1.1.2.8. Personnel portrait

Based on the age structure and age distribution, knowledge structure, professional structure, resume characteristics, and familiar fields, more than 20 staffing control conditions are sorted out to analyze the specific team staffing situation and the overall team staffing situation in the region, and provide information on job selection and job selection. and other program support.

1.1.1.1.1.3. A map of urban governance

1.1.1.1.1.3.1. Overview of Urban Governance

Establish an overview portrait of urban governance, aiming at urban governance areas such as grassroots governance, smart transportation, smart law enforcement, and three-defense emergency, comprehensively display the overall situation of urban governance in Nansha District in terms of numerical ratios, month-on-month changes, year-on-year changes, and structures.

Using CIM technology and GIS technology, in the form of 3DGIS map and list, visually present the distribution of people coming to Guangzhou, the number of grid incidents reported, the traffic track, the number of traffic accidents, the number of casualties, the number of major and important cases, and the number of cases involving criminal transfers number, total number of emergencies, potential risk sources, etc.

Correlate and compare data indicators such as the number of grid events reported, traffic tracks, traffic accidents, and casualties with the population and the number of people coming to Guangzhou, comprehensively display the correlation between various data indicators, and analyze the major events caused to provide decision-making reference for strengthening basic governance.

▲The bidder has the ability to research and develop systems related to the release of emergency early warning information, and has the independent intellectual property rights of "emergency early warning information release". The software copyright registration certificate obtained by the bidder that contains the words "emergency warning information release" must be provided.

1.1.1.1.1.3.2. Grassroots Governance

In accordance with the working philosophy of "big grid, great wisdom, great inspection, great participation, and great control", based on the grid integrated information management platform in Nansha District, relying on the global data center in Nansha District, fully access to the integrated information required for grid management Business data (such as population, grid division, event handling, rental housing, etc.). In accordance with the requirement of "handling one thing efficiently", the working status of the basic grid is displayed, and the basic information of the community/grid is found out by strengthening the inspection of the components and events of the unit grid and the supplement and improvement of the data of the population and rental houses in Guangzhou. All elements. Select areas such as environmental sanitation, city appearance, garbage classification, urban management and law enforcement, etc. to provide overall situational awareness of each scene. Complete the digital, networked, and intelligent processing of various social governance businesses, display social governance business data "horizontally to the edge, vertically to the bottom", comprehensive, intelligent, and refined, and provide auxiliary decision-making, Data and capability support for supervision and assessment and command and dispatch.

▲The bidder has the independent research and development capabilities of urban operation risk identification related systems, and has the independent intellectual property rights of "intelligent risk identification". The software copyright registration certificate containing the words "intelligent risk identification" obtained by the bidder must be provided.

▲The bidder has the ability to research and develop systems related to urban grid management, and has the independent intellectual property rights of "grid management". The software copyright registration certificate containing the words "grid management" obtained by the bidder must be provided.

1.1.1.1.1.3.3. Smart Transportation

Make full use of technologies such as the Internet of Things, artificial intelligence, video analysis, and computable road network (digital road network model), integrate data from Nansha District Traffic Police, Public Security Police, and Transportation Bureau, and integrate IoT data, video data, and social data , with the help of map technology, combined with checkpoints, electric police, and surveillance video to monitor the traffic status of key road sections in the whole region in real time. Realize the analysis of the overall operation situation of urban traffic, integrate and manage special information such as comprehensive traffic, road transport, traffic road network, urban traffic, and traffic management in the whole region, and comprehensively analyze the transportation capacity and passenger flow of buses, taxis, and subways in the region, etc. Comprehensive hub passenger transportation and other conditions, realize urban traffic operation monitoring and congestion index analysis services, strengthen comprehensive traffic operation monitoring and scientific guidance, help traffic business managers grasp the overall traffic operation situation of Nansha District in real time, and improve the traffic service management level of the whole district.

1.1.1.1.1.3.4. Smart Law Enforcement

Actively promote the "big integration" of administrative law enforcement, and implement comprehensive administrative law enforcement innovations such as "one team manages law enforcement", "one list specifies responsibilities", "one platform handles incidents", and "one set of mechanisms establishes norms". Based on the administrative law enforcement information platform of the Department of Public Security and the administrative law enforcement supervision network platform, coordinate and promote the disclosure of administrative law enforcement information; increase the extension of law enforcement forces to the grassroots, and rely on the Nansha District Global Big Data Center to realize the aggregation and sharing of administrative law enforcement resources and grassroots grid center resources , the comprehensive law enforcement team is linked with the law enforcement forces of other departments such as emergency response; by connecting with the comprehensive administrative law enforcement UAV inspection and monitoring platform in Nansha District, using high-tech technologies such as "drones" to achieve full coverage of violations, control and violations, and improve the efficiency of law enforcement command and dispatch Sophisticated and intelligent level. Supported by the law enforcement auxiliary system, the law enforcement information management in the process of law enforcement, flexible law enforcement management, work assessment, law enforcement supervision, etc. are displayed to facilitate the understanding of the actual situation of law enforcement in the entire Nansha District, and to assist relevant departments in decision-making and command and dispatch. support.

▲The bidder has the research and development capabilities of related systems for interim and post-event comprehensive supervision, and has independent intellectual property rights for "intermediate and post-event comprehensive supervision". The software copyright registration certificate obtained by the bidder containing the words "comprehensive supervision during and after the event" must be provided.

1.1.1.1.1.3.5. Three defense emergency

The application construction of emergency management theme will meet the needs of emergency management departments for emergency daily safety monitoring through data sharing and exchange between platforms. Combined with the three-water waterproof cultural monitoring and video early warning system in Nansha District, Guangzhou City, the automatic monitoring and early warning information system for hidden geological hazards in Nansha District, the information system of toxic and harmful gas environmental risk early warning system in Xiaohu Island Chemical Industry Park in Nansha, the comprehensive management platform for smart cities in Nansha District, Nansha District safety production work management platform, Nansha three-defense small program, etc., integrate basic data and real-time monitoring data of professional departments such as emergency response, three-defense, meteorology, water affairs, etc., and integrate accidents and disasters, rescue forces, materials and equipment of relevant departments in the shared area Information resources, establish emergency-related basic resource databases and special databases in Nansha District, initially realize risk source perception, mastery and analysis of safety production, hidden risks, accidents and disasters, integrate Internet data resources, create a map of emergency management, and gradually build An emergency management application platform integrating supervision and management, resource management, monitoring and early warning, and auxiliary decision-making.

▲The bidder has the independent research and development capabilities of urban operation disaster prevention monitoring and early warning decision-making command systems, and has the independent intellectual property rights of "disaster prevention monitoring and early warning decision-making command". The software copyright registration certificate obtained by the bidder including the words "disaster prevention monitoring and early warning decision-making command" must be provided.

▲The bidder has the ability to research and develop systems related to the supervision of major urban hazards, and has the independent intellectual property rights of "supervision of major hazards". The software copyright registration certificate obtained by the bidder containing the words "supervision of major hazard sources" must be provided.

▲The bidder has the ability to research and develop systems related to the access and monitoring of major urban hazards, and has the independent intellectual property rights of "access management and real-time monitoring and early warning of major hazards". The software copyright registration certificate obtained by the bidder including the words "major hazard source access management and real-time monitoring and early warning" must be provided.

1.1.1.1.1.4. A map of public services

1.1.1.1.1.4.1. Overview of public services

The overview of public services comprehensively presents the overall situation of community services and government services in Nansha District from different directions and dimensions, so that users can have an overall perception of the overall situation of public services in Nansha District. Community service analysis mainly displays key data indicators such as community population, permanent resident population, and immigrant population. The analysis of government services mainly displays data indicators such as the number of government service halls, the number of government service online transactions, the number of government service all-in-one machines, and the good and bad reviews of government services.

The platform uses visual modeling services, GIS technology and other capabilities, based on business layers, to comprehensively display the data indicators related to community services and government services in various streets, towns and communities, and to comprehensively evaluate the public service environment in Nansha District.

Combining community population structure, distribution points of government service capabilities, and epidemic-related data to make a comprehensive analysis of the relationship between various data indicators such as communities, government affairs, and epidemics throughout Nansha, and based on the analysis of the community and government services in the whole region, The implementation of public services such as epidemic prevention and anti-epidemic provides a decision-making reference for strengthening basic epidemic governance.

1.1.1.1.1.4.2. Government services

By integrating the "one door" and "one window" government service data of various types of government service entity halls in Nansha District, it provides a panoramic overview of government services in the whole district, summarizes government service items, and combines the number of legal person cases and individual cases Data information such as volume, departmental handling volume, popular business acceptance items, good and bad reviews, etc. provide assessments for optimizing our district’s business handling capabilities, improving government service efficiency, government service processing maturity, service item coverage, and service satisfaction. Basis and decision support.

▲The bidder has the ability to research and develop systems related to government service monitoring, and has the independent intellectual property rights of "government service monitoring". The software copyright registration certificate containing the words "government service monitoring" obtained by the bidder must be provided.

▲The bidder has the ability to research and develop systems related to the operation and management of government services, and has the independent intellectual property rights of "operation and management of government services". The software copyright registration certificate containing the words "government service operation management" obtained by the bidder must be provided.

1.1.1.1.1.4.3. Community service

With the concept of "smart life, integrated services", making full use of advanced technologies such as the Internet of Things and cloud computing, creatively centering on citizens and communities, integrating various service facilities and service resources that urgently need to be solved and improved in citizens' lives, and creating residents Live a "harmonious, safe, convenient, happy" community, forming a new community management model based on massive information and intelligent filtering and processing. With the smart village platform as the link, combined with the community service system covering all aspects of residents' lives, the safety of the community, the health of residents, the stability of the community, the improvement of the quality of life of residents, the direct delivery of smart government services to households, and the realization of government services From passive acceptance to active care, we will build a new community form for the future.

Analyze and display the signs and indicators related to community services, and link with the smart village platform page nested jump and system functions. After the jump, it can be synchronized with the smart village, and the basic information of the community and public For detailed information such as service conditions and public security conditions, if you need to view details, you can also click on relevant elements on the operation monitoring platform, drill down to the smart village platform, and interact with it in real time on the standard interface of the operation monitoring platform to meet the needs of the comprehensive social governance department. The needs for the development of business related to social governance. Provide information support for the leadership's unified management and scientific decision-making through the situational information of the main business scenarios of community services in Nansha District.

1.1.1.1.1.5. A graph of economic operation

1.1.1.1.1.5.1. Overview of Economic Operation

The overview of economic operation is based on thematic analysis models such as macroeconomic analysis, industry analysis, comprehensive analysis, and enterprise operation services, and presents Nansha District's leading industries, data industries, emerging industries, advanced manufacturing industries, and technological innovation resources in the form of multi-dimensional visual graphics. index.

The platform applies CIM technology and GIS technology capabilities, and based on the business layer, it comprehensively reflects the linkage relationship between various economic indicators in Nansha and the business layer, and comprehensively reflects the local economic operation relationship in Nansha District.

Integrating Nansha's industrial economic excuses, industry distribution, key company rankings, and city positioning analysis of key industries, combined with the guiding spirit of the State Council as a whole, to strengthen the recognition and policy guidance of Nansha District's economic positioning in the Greater Bay Area refer to.

The application construction of the theme of economic operation will make full use of the in-depth analysis of economic operation analysis applications and related applications of the enterprise life cycle platform. Through data sharing and exchange between platforms, page nesting and jumping and system function linkage, after the jump, it can be integrated with the economy. The operation analysis is synchronized with the in-depth analysis. The operation monitoring platform can also see detailed information such as macroeconomic analysis, industrial economic analysis, enterprise and comprehensive analysis. If you need to view details, you can also click on the relevant elements on the operation monitoring platform to drill down Apply the in-depth analysis system to the analysis of economic operation, and link it in real time in the standard interface of the operation monitoring platform to meet the needs of the economic management department for the analysis of macroeconomic indicators, industry analysis, and comprehensive analysis in Nansha District. It is built around macro analysis in the field of economic operation, industrial operation, comprehensive analysis, and enterprise services.

1.1.1.1.1.5.2. Economic Operation Analysis

Economic operation analysis includes macro analysis, industry analysis, comprehensive analysis, enterprise services, etc.

1.1.1.1.1.5.3. Smart investment promotion

Investment attraction refers to the activities of local governments to absorb investment, and it is the main work of local governments at all levels. In order to promote the construction of "three districts and one center" in Nansha with high quality and give full play to the advantages of policy resources in Nansha District, all government departments should increase investment promotion and strengthen various forms of government-enterprise cooperation. The special topic of investment promotion presents the key indicators of Nansha District’s urban economic operation, grasps the situation of headquarters economic enterprises in our district, conducts classified analysis of enterprises in the whole district, displays information on the fulfillment of policies in our district, analyzes and evaluates the business environment, utilization of foreign capital and policy fulfillment in our district.

Key enterprise construction projects are an important guarantee for the comprehensive strength of a city, and also the competitiveness of the city's sustainable development. The investment promotion topic will be connected with Nansha District's key project management system and enterprise preparation service management platform to obtain key enterprise construction projects. The status and demands of enterprises, presenting the basic information and progress of enterprise projects, understanding the key concerns and demands of enterprises, and ensuring the smooth construction of key enterprise projects.

▲The bidder has the ability to research and develop systems related to smart management of the business environment, and possesses independent intellectual property rights of "smart management of the business environment". The software copyright registration certificate obtained by the bidder containing the words "business environment smart management" must be provided.

1.1.1.1.1.5.4. Industry Map

Industrial economic analysis is an emerging economic application used in modern economics to analyze real economic problems. It takes "industry" as the research object, mainly including the analysis of industrial structure, industrial organization, industrial development, industrial layout and industrial policy, and the research impact The industrial structure composition, development direction, organizational management, and policy fulfillment of economic development in our district play an extremely important role in forming a reasonable industrial policy in our district and promoting the coordinated development and progress of industries. The topic of industrial economy will present the overall situation of Nansha District’s industrial economy in the form of an industrial map, and with the help of enterprise data purchased from the Internet, based on general industrial analysis methods and models, such as time series methods, cross-sectional analysis methods, linear regression methods, etc. , analyze the region's industrial investment environment, industrial economic development trends, and industrial economic development rankings, and provide auxiliary decision-making support for the economic operation and scheduling of government departments in our region.

Table of contents

1. Project overview

2. Project construction goals

The goal of building

Overall objective

3. Current status of informatization

Brief overview of the overall status

Status and Analysis Requirements

4. Overall Technical Requirements

overall framework of the project

system structure

Construction of Standards and Regulations

4.1.1. Follow the standard specification

4.1.2. System, mechanism and standard specification construction

Application support platform and application system construction requirements

4.1.3. Integrated support platform

4.1.4. "Digital Nansha" urban transportation center

4.1.5. "Digital Nansha" capability center

4.1.6. Platform docking

Other (terminal, supporting management, etc.) system construction requirements

4.1.7. Construction of institutional mechanisms and standards

4.1.8. Enterprise data procurement requirements

4.1.9. Visual model service construction requirements

4.1.10. Data visualization application platform requirements

4.1.11. Converged Communication Supporting Equipment

4.1.12. Geographic Information System Upgrade and Supporting Services

4.1.13. Adaptation verification service

Government Cloud Platform Expansion Requirements

4.1.14. Cloud platform partition construction requirements

4.1.15. The overall architecture of the cloud platform

4.1.16. Cloud Service Directory

4.1.17. High availability and high reliability design

Equipment room and supporting engineering construction needs

4.1.18. Construction demand of urban transportation center

4.1.19. Relocation of computer room and demand for supporting engineering construction

5. Procurement list of software, hardware and services for this project

Integrated support platform

"Digital Nansha" urban transportation center

"Digital Nansha" capability center

"Digital Nansha" Capability Encapsulation

Docking system

City Sports Center

5.1.1. Display system

5.1.2. Integrated display and control

5.1.3. Sound reinforcement system

5.1.4. Video conference system

5.1.5. Digital Conference System

5.1.6. Electronic table cards

5.1.7. Background music

5.1.8. Meeting number

5.1.9. Voice assistant system

5.1.10. Command Console

5.1.11. Computer room construction

5.1.12. Integrated wiring

Government cloud platform expansion

Computer room relocation and supporting projects

5.1.13. Government computer room renovation

5.1.14. Equipment Relocation and System Migration

5.1.15. Leasing of new government affairs cabinets

5.1.16. Link Lease

5.1.17. General Software (Digital Hub Project)

5.1.18. General software (other business systems)

Other purchasing needs

5.1.19. System, mechanism and standard specification construction services

5.1.20. Enterprise data procurement

5.1.21. Visual modeling service

5.1.22. Data visualization application platform

5.1.23. Converged communication equipment

5.1.24. GIS Supporting Services

6. Management requirements during the project construction period

Duration, plan and schedule management requirements

Project organization and personnel management requirements

Project Implementation Requirements

Project Supervision and Management Requirements

Security and confidentiality management requirements

Training Service Requirements

6.1.1. Training objectives

6.1.2. Requirements for trainees

6.1.3. Training Content Requirements

6.1.4. Training methods and program requirements

6.1.5. Training Quality Assurance

6.1.6. Training effect management requirements

Project operation and maintenance requirements

6.1.7. Project operation and maintenance service organization

6.1.8. Project operation and maintenance service scope

6.1.9. Project operation and maintenance service process

6.1.10. Project operation and maintenance service requirements

6.1.11. Project fault response emergency solution requirements

6.1.12. Processing method during project failure

6.1.13. Project operation and maintenance assessment method

7. Project acceptance requirements

Prerequisites for project acceptance

Project Acceptance Requirements

Project acceptance method

Project acceptance procedure

8. Description of project-related construction requirements

1. Security and confidentiality agreement

2. Payment method