List of major science and technology projects in Sichuan Province "revealing the list and taking command"

 

The 2022 Sichuan Provincial Major Science and Technology Special Project "Unveiling the List and Leading the List" project list is being declared! The editor has sorted out the relevant requirements and content of the 2022 Sichuan Provincial Major Science and Technology Project "Unveiling the List and Leading the Command" project list. Interested family members must not miss it!

The 2022 Sichuan Provincial Major Science and Technology Project "Unveiling the List and Leading the Command" Requirements for Unveiling the List

The leading unit for unveiling the list should be a scientific and technological enterprise in the province or a consortium led by it, as well as a university or a scientific research institution, and must meet the following conditions:

  1. There are strong research and development capabilities, good scientific research conditions, and a stable team of scientific research personnel.
  2. Able to propose feasible solutions to overcome key core technologies according to the needs of the list-publishing projects, master independent intellectual property rights, have a technical support team and relevant experience in the transformation of achievements, and be able to complete the implementation of technology applications.
  3. Applicants must have good scientific research ethics and social integrity, have not been included in the joint punishment list or "blacklist", and have no bad credit records or major violations of the law in the past three years.
  4. It is committed that the project results must be transformed in Sichuan Province.

The 2022 Sichuan Provincial Major Science and Technology Project "Unveiling the List and Leading the Command" Project List

1. Development of key materials for high-efficiency vanadium battery energy storage and system integration application

Aiming at the low integration level and low energy density of the current vanadium battery system, research key technologies such as high energy density electrolyte preparation technology, high power density single stack design and assembly technology, and break through the development and integration of key materials for vanadium battery energy storage Apply technology to form a high-energy-efficiency, high-integration vanadium battery energy storage system application demonstration.

Breakthrough in 4 key technologies, sulfuric acid system electrolyte energy density ≥ 28 Wh/L; single stack power ≥ 30 kW, current density ≥ 240 mA/cm2, energy efficiency ≥ 80 %; complete MW level with high energy efficiency and high integration Vanadium battery energy storage application demonstration, applied for more than 10 invention patents, and achieved sales revenue (output value) of more than 100 million yuan.

Time node: The research and development time limit is 3 years, and the "milestone" assessment will be carried out 18 months after the project is established.

Amount of the list (financial funds): 8.5 million yuan, and the supporting funds of the unveiling unit are more than 2:1.

2. Research and application of key technologies for new solid-state storage devices

Aiming at the problems of the data center storage system being limited by the level of media technology, research technologies such as localized enterprise-level new solid-state hard disk storage, operator hardware offloading, and computational storage disk control; improve the data processing capabilities of solid-state hard disks and the application performance of storage devices , forming new solid-state storage devices and carrying out application demonstrations.

Breakthrough in 3 key technologies, and realize unloading/loading 500MB data in less than 1 second through operator unloading. Apply for/authorize 4 invention patents, formulate 1 enterprise standard, establish 1 provincial platform, form 2 innovative products, and achieve sales revenue (output value) of more than 80 million yuan.

Time node: The research and development time limit is 4 years, and the "milestone" assessment will be carried out 2 years after the project is established.

Amount of the list (financial funds): 5 million yuan, and the supporting funds of the unveiling unit are more than 2:1.

3. Development of key technologies and core equipment for variable-speed pumped storage equipment

Aiming at the key technical problems of the localization of variable-speed pumped storage, master the dynamic characteristics of full-power variable-speed pumped storage, break through the coordinated control technology of multiple components and multi-working conditions; overcome the design and control technology of 100,000-kilowatt variable-speed pumped-storage converters ; Research and develop a complete set of 100,000-kilowatt full-power variable-speed pumped storage equipment and carry out demonstration verification.

Break through more than 10 key technologies, realize variable-speed pumped storage speed regulation range of not less than ±10%, power generation power regulation range of 50%~100%, pumping power regulation range of 75%~100%; apply/authorize 10 invention patents, form 4 innovative products and 1 set of prototype equipment have been developed, achieving a sales revenue (output value) of more than 60 million yuan.

Time node: The research and development time limit is 3 years, and the "milestone" assessment will be carried out 18 months after the project is established.

Amount of the list (financial funds): 4 million yuan, and the supporting funds of the unveiling unit are more than 2:1.

4. Research and development of key equipment for mountain cog railway train operation control and power supply system

For mountain cog railways, develop mountain cog train operation control systems; study high-altitude DC 1500V traction power supply system insulation and insulation coordination technology; develop distribution-type prefabricated cabin substations in high-intensity earthquake mountainous areas; develop key technologies for high-altitude contact rails in mountain rail transit and equipment; developed high-altitude rectifier transformers; carried out supporting applications and assessment verification, developed 4 new products, and applied for more than 12 invention patents.

The developed technical equipment has been applied to the cog rail test line and mountain rail transit project in our province respectively.

Time node: The research and development time limit is 4 years, and the "milestone" assessment will be carried out 2 years after the project is established.

The amount of the list:  11 million yuan, and the supporting funds of the unveiling unit are more than 2:1.

5. 800MN large-scale die forging press digital and intelligent key technology and application of forging forming process

Carry out digital integration technology research on forging process of large-scale die forging press, realize intelligent perception, dynamic simulation and automatic optimization, etc. Research on multi-dimensional data acquisition and key parameter intelligent perception technology in the whole process of forging and forming of high-performance complex metal components, data-driven multi-field and multi-scale dynamic simulation and optimization technology in the whole forging process; study intelligent process planning technology for forging of high-performance complex metal components, and establish a high-performance Forging process database, knowledge base, and model base for complex metal components; develop software and hardware platforms for multi-dimensional data acquisition system for the whole process of forging and forming high-performance complex metal components, and demonstrate it on the 800MN die forging press for the forging of key metal components for aviation equipment. Apply for no less than 8 invention patents, and formulate no less than 2 industry/enterprise standards.

Time node: The research and development time limit is 3 years, and the "milestone" assessment will be carried out 18 months after the project is approved.

Amount of the list (financial funds): 9 million yuan, and the supporting funds of the unveiling unit are more than 2:1.

6. Development of intelligent flexible processing system for precision box parts

In response to the major demand for domestic independent controllable flexible manufacturing systems for key box parts in the fields of aerospace, high-end CNC machine tools, and automobiles, develop flexible manufacturing unit control systems and core functional components; develop no less than 3 key processing equipment integrated The intelligent and flexible processing system (unit) of box-type parts realizes parallel intelligent scheduling; compared with the single-machine processing method, the processing pass rate and processing efficiency are greatly improved; the flexible intelligent manufacturing management system is developed; the performance knowledge map of key components is established and Knowledge base; realize application demonstration in aerospace, machine tool, automobile and other industries. Apply for no less than 10 invention patents.

Time node: The research and development time limit is 3 years, and the "milestone" assessment will be carried out 18 months after the project is approved.

Amount of the list (financial funds): 6 million yuan, and the supporting funds of the unveiling unit are more than 2:1.

7. Development of special operation robots for grain storage and brewing

In view of the major demand for the development and application of intelligent special robots in grain storage, processing and other links, develop special operation robots for warehousing, fine leveling and sample cutting for smart granaries; A special operation robot for picking wine; and it has been applied and demonstrated in grain depots directly under the state and leading liquor brewing enterprises. Develop two types of robots for special operations of grain storage and brewing, and apply for no less than 20 invention patents.

Time node: The research and development time limit is 3 years, and the "milestone" assessment will be carried out 18 months after the project is approved.

Amount of the list (financial funds): 6 million yuan, and the supporting funds of the unveiling unit are more than 2:1.