Pipeline Integrity Project (3)------System Architecture and Functional Design

This stage is the work of the project manager. First, according to the familiar situation of the business, conduct an overall evaluation of the business functions of the system design, complete the basic architecture design of the system, and then roughly list the main functional modules of the system, and finally determine the system deployment. The network topology used. System technical framework, system security measures, deployment description, and define the approximate development cycle and stages of the project. form a document.

Guess you like

Origin http://10.200.1.11:23101/article/api/json?id=326903246&siteId=291194637