Pipeline Integrity Project (2)------Technical Solution Selection

As a project manager, after the first business training, it is necessary to track the direction of business requirements in time, or the goal of the system. If there is a mature product, choose it as a reference when the project direction is determined. Or when the business understanding is almost the same, what should be done at this time is to determine the technical solution and determine which framework to use. The specific solution determination methods are as follows:

1. Discuss with the project team members, compare the usage of various frameworks of the company, and the usage habits of the members. It is best for each member to submit a technical selection plan.

2. Hold a meeting with the leader to do the index score of the technical plan to determine the use of the technical framework.

Finally, according to the discussions of the two upper and lower meetings, the project manager determines a specific technical solution.

Guess you like

Origin http://10.200.1.11:23101/article/api/json?id=326903500&siteId=291194637