daily start

2019/4/26

1. to summerize the merge experience, about makefile, about compile error analysis.

2. look back what about latch is missed.

3. solve CAN control release latch.

4. PPT time 30 minutes. [everyday, change mind-pattern to watch what i did]

2019/4/24

to make OK.

猜你喜欢

转载自www.cnblogs.com/dannykong/p/10762433.html