如何手动创建SAP S/4HANA的生产订单

版权声明:本文为博主原创文章,未经博主允许不得转载。 https://blog.csdn.net/i042416/article/details/86648352

A production order specifies which material is to be produced, where it is to be produced, which operations are required to do this and on which date production is to take place. It also defines how the order costs are to be settled. 也负责决定订单的费用如何决定。

S/4HANA的生产订单既可以手动生成,也可以基于一个planning order自动生成。

As described in this procedure, production orders can be created manually without being previously requested. Alternatively, they can be automatically created by converting a planned order. During requirements planning (MRP run), planned orders are created at every BOM level to cover requirements.

在需求计划阶段(即MRP run阶段),planned order在BOM级别被创建,负责承担费用。

事务码CO01:
维护必填字段Material,即待生产的物料

生产工厂ID: 2800

Order Type PP04:

clipboard1

敲回车,进入明细页面,此时观察到已经生成了一个缺省的Order ID了,因为还没有点保存,所以这只是一个临时的ID。这时可以看到这几个状态就是生产订单的初始状态:

clipboard2

  • REL:Released
  • PRC: Pre-costed
  • DISB: Distributed to MES
  • MANC : Material availability not checked
  • SETC Settlement rule created

clipboard3

点保存后,生成真实的ID,存储到数据库里。

clipboard4

要获取更多Jerry的原创文章,请关注公众号"汪子熙":

猜你喜欢

转载自blog.csdn.net/i042416/article/details/86648352