Teamwork -Beta sprint

This work belongs courses <Links courses>
Where the job requires <Link job requirements>
Team Name Flying Pig who
The target job Α release version of the project, the project case testing, and project case summary

First, team members learn number list

  

student ID

Full name

201731062125

Peng Jie dispute (Leader)

201731062121

Luo Xin

201731062123

Yao Qi

201731034304

Lewis Green

201531080026

Gao Long

201731044205

View Huimin

201731062126

Liang Jiang

 

Second, the project address and instructions to download and install

  Links: https://pan.baidu.com/s/1-Q2ZhrQv6m4YaHGU0yMmEg
  extraction code: 66v0 
  Use of mobile phones into the Baidu cloud network disk download.

 

Three, Beta version of the test report

 

student ID

working arrangement

201731062125

Arrange testing and is responsible for schedule management

201731062121

Code review

201731062123

Code review

201731034304

Code Review

201531080026

Case testing

201731044205

Case testing

201731062126

The error code review and test record

   And α different versions:

    Contrast α version, the Beta version, we have our music app is optimized interface and buttons, which interface has been re-designed the app look more beautiful. At the same time, we have also been added to the function. Timing and increases the functionality of the shuffle. Finally, we also changed the music play mode app. Play the music from the original user has selected, and now we have three default music style. Users only need to click a style, click in the broadcast, you can shuffle the music in this style.

  

  What kind of problems encountered in the sprint Beta stage, how to solve:

   1. Timing function is implemented in the sub-thread, while Android does not allow child thread changes ui interface

  A: Andrews accepted by Baidu know which message notification mechanism (hander Class) message from the child threads, and updates ui interface, the interface to achieve regular time gradually decreases interface

  2. The selected image at different resolution screen, draw up the picture, change the picture looks

  A: The time reasons, not yet resolved

  3. Select the countdown time and the actual time is not the same

  A: Click the blank space of time, access to the click event, time synchronization sub-timed thread and the main thread

 IV. Summary 

   For this project development, as we have limited experience, it is the first contact Andrews aspects. Many things are off now, very familiar. Run into a little problem, you may have to spend a lot of time to resolve. How it is also for this reason that lead us time is not very adequate. So plan some features of the app did not materialize, in this regard, we need to reflect.

  However, although this time there is no plan as to do so perfectly. But for our team everyone, this is a learning opportunity. Let's immediate field of experience to the development of a project, from start to finish is not so easy. Imagine a very simple thing, but a time to start actually doing, is not so simple, will encounter many unexpected problems, and these problems can be fatal. So, in the future study career, more than the accumulation of professional knowledge, actual operation.

  Finally, thanks to persistent project partners since this month.

 

 

 

 

  

 