itest 4.1.0 release, BUG management & tracking Agile test management software

      V4.1.0 based on user feedback, a total increase of 23 update: with 11 enhancements and 12 BUG repair. Greatly facilitate the implementation of the new test, test cases can take kanban is set to the home page, where you can perform continuous iteration of your use cases, while cases of import and export and sync with offline processing more friendly, return specific data synchronization. Details V4.1.0 follows:

11 enhancements:

(1) import and export use cases, offline sync .

       After embodiment offline processing, re-synchronized to the system, add homologous check, while the introduction end of the display synchronization of how many modified offline use cases, and a synchronization of how many use cases performed off-line, how many use cases and introducing new . FIG see the following three

(2) executable test iterations in Kanban

Kanban, when clicked to test packet, the current test case executor package, display interface test package execution cases, if not the current test case executor package, viewed with the display cases, and an automatic, next, very convenient

(3) iteration report can be viewed in Kanban

Test kits test phase can be treated as a task, to facilitate the distribution of different practitioners, but is not convenient to count iterations of the test results from the level of iteration, so to add an iterative report Kanban

(4) when exporting the root node is not written in the functional items, the post was deleted checksum use case derived, and then do some modifications, when then import to add way, mislead project to build a name as a secondary node

(5) submit test needs to check if any added demand items

(6) test page packet, the performance or use cases view, also shows the progress of the test

(7) Example package list page, to increase drop-down list ,, executor default display to the test pack I

Hover over (8) to change the signage, the test kits, tasks, and test iterations on the links

(9) In the execution example of a page, using the modified embodiment, the window may then no longer closed execution Example 

(10) The use package dispensing person to Example executors, and the same column in the list head

(11) or with cases introduced into the processing line synchronization (when used in Example 161), optimized to 3.1 seconds before, preferably 1.5 seconds, if the guide with multiple cases, more effective

 

 

12 BUG FIX:

1:新建的项目,测试了测试流程,提交了测试需求,进总揽页面,好多数据不显示,浏览器控制台有报 错,JS 卡了,导致所有页面不能访问
2:用例运行成本不是2的情况下,在用例包分配中不显示 
3:迭代关联项目时,逻辑删除的项目,没过滤掉 
4:迭代选择测试包也不对,显示的测试包比实际的要求  
5:分配用例时用例没有滚动条,只能选10条(笔记本上好使,仅台式机上有这问题)  
6:迭代中,处理BUG,任务,和用例包的界面,在台式机上看不到分页组件,没法分页  
7:导入用例包以同步线下处理时,如果之前导出和现在的导入不同源,会导致执行计数出问题  
8:有些用例因数据原因无法正常导入 
9:测试用例管理中 有个别节点,显示的用例数为X,在测试用例包分配用例时,这个节点的用例为为Y ,Y<X  
10:迭代管理中处理其下BUG时,上一个,下一个,失效 
11:迭代里的 项目BUG 列表,有时候分页不正常
12:修改安装程序,如发安装有tomcat 且CATALINA_BASE 环境变量,启动ITEST 的服务,实 际启动是已安装的TOMCAT,不是ITEST的TOMCAT