Team contribution points allocation
A, Alpha
There is the development of failure, not a simple effort to measure the contribution
first name | Character | Team contribution points | Specific, measurable, verifiable contribution |
---|---|---|---|
you | PM | 40 | 14 blog, a survey questionnaire |
st | Dev | 54 | The first version of the docking and Development |
ZJ | Dev | 51 | The first version of the development |
mm | Dev | 52 | The first version of the interface |
zzy | Test | 53 | The second development version |
zpz | Test | 50 | 2nd edition |
Two, Beta
first name | Character | Team contribution points | Specific, measurable, verifiable contribution |
---|---|---|---|
you | PM | 100 | 10 blog, once a technology blog, home page development |
FST | Dev | 36 | Personal information page docking, url redesign |
zzy | Dev | 39 | And back-end framework to guide the docking interface, bug feedback and final repair |
mm | Test | 38 | Front-end guidance, technical support |
zpz | Test | 37 | Scenario testing, unit testing |