Java Smart Construction Site System Source Code (Microservice+Java+Springcloud+Vue+MySQL)

The smart construction site system is a big data management platform based on the Internet of Things, the Internet, AI, and visualization. It is a brand-new management model that can realize the intelligence and Internetization of labor management, safe construction, and green construction. Focusing on the five dimensions of construction site management including man, machine, material, method, and environment, as well as the three major systems of construction process management, including progress, quality, and safety, it realizes comprehensive and efficient project management needs and meets the needs of multiple roles and perspectives on the construction site. Effective supervision realizes cost reduction and efficiency increase in project construction management, and provides data support for the supervision platform.

1. Features of Smart Construction Site System

1. The system adopts microservice architecture;

2. Support multi-terminal display: PC, tablet, mobile APP;

3. The digital twin visualizes the smart big screen, and one picture can grasp the overall situation of the project;

4. Relying on the data interaction sub-platform to form data fusion between users' multiple systems;

5. The IOT cloud platform realizes the connection of IOT devices and data transmission and processing.

Video monitoring: Real-time monitoring and video recording of the construction site is mainly realized by installing cameras and sensor equipment. Through the monitoring system, managers can check the situation on the construction site at any time, discover and deal with potential safety hazards in a timely manner, and conduct remote guidance and supervision.

Environmental monitoring: display the real-time monitoring data of environmental monitoring, and at the same time combine the environmental monitoring equipment on the construction site and the data of the meteorological station at the location of the project to obtain the air quality score. Real-time monitoring: wind speed, wind direction, temperature, humidity, TSP, dust (PM2.5), dust ( PM10), noise and other data, the abnormal data will be automatically alarmed and sent to relevant personnel, and can be automatically linked with spraying and noise reduction equipment to reduce dust and noise.

 

Labor real-name system: mainly through face recognition and other technical means to authenticate and manage the identity of construction workers. Manage personnel information addition and other management for project managers and construction personnel, one file for each person, and the added information includes personnel identity photos, contracts, certificates, medical examination information, etc. in addition to basic personnel information. Through this system, it is possible to accurately record workers' attendance, working hours statistics and other information, improve management efficiency, and provide workers with better working and living conditions.

Project progress: According to the actual situation of the project, the management personnel fill in the milestone nodes of the project. When the milestones are reached, the actual time is filled in, the approval is passed, and the acceptance of the progress nodes is completed.

 

Machinery and equipment: Quickly add and delete various types of IoT equipment, establish electronic equipment files through information application, and realize electronic and information management of mechanical ledgers.

Project information: maintenance of basic project information, management of participating units, types of work, roles, and unit types.

Early warning center: flexibly configure early warning rules, early warning levels, etc. for various events on the platform, generate early warning rule bases, and generate statistics and platform early warning event ledgers, which can be filtered and queried by event type, name, time, level and other conditions.

 

2. Supervision module:

Home
Site Data Analysis
Project Personnel Analysis
Hazardous Project Analysis
Environmental Monitoring Analysis
Project Personnel Supervision
Video Surveillance Supervision
Hazardous Project Management
Green Construction Supervision
On-site Material Supervision
Supervision of Safety Hidden Risks

 

3. Project side module:

Home
Project Personnel Management
Video Surveillance Management
Hazardous Project Management 
Site Material Management
Green Construction Management
Safety Hidden Potential Investigation
Construction Quality Management
Construction Progress Management Construction
Site Equipment Management

 

【Alarm statistics】

Alarm statistics display mechanical equipment and environmental alarm information, alarm displays the number of alarm devices, and the total number displays the number of devices.

Click the number of alarms, the number of devices or the environmental status label to jump to the related record page.

【Real-time alarm list】

The real-time alarm list displays real-time alarm data, and distinguishes whether the data is alarm data or early warning data according to the color of the alarm content.

 

【project progress】

Project progress shows project plans and completed progress.

【Labor information】

Labor information statistics personnel attendance data.

 

【Hidden danger information】

The hidden danger information displays the histogram of safety hidden dangers and quality hidden dangers.

【Overview of machinery and equipment】

Display relevant data of tower cranes, elevators, hooks, deep foundation pits, high formwork and other equipment.

 

【Tower Crane Monitoring and Analysis】

This function displays tower crane-related information, such as tower crane basic information, real-time data, operating status, driver information, etc. Click the middle tower crane name to switch tower crane equipment.

Guess you like

Origin blog.csdn.net/qq_27741787/article/details/132357572