YAYAYAYAYAYAYAYAYAYAYA
Please ignore messy wiring
Probably such a strike
do vlan routing and the Q80, configure Vlan port on GS108PE to illustrate
W7 is AP, with four extended network port
DGS105 fools switch
STEP① and STEP②PC can obtain an IP address and access to the network
but said that so After doing it for a long time, the fool switch will restart because of the cache. This is not tested.