Production test equipment and tools

Equipment needed:

1.PC (CRT installed software, programming software).
2.MCU program line (with the system can be installed in).
3. serial line (with the system can be installed in).
4. The gateway board (with 5V power supply, cable, can be installed in the system with a).
5. Other TBD.

 

Guess you like

Origin www.cnblogs.com/shlb/p/12446584.html