JMeter study notes 10-Graph Results Introduction

This article describes the function continues at Lisenters, introduced Graph Results here.

1. prerequisite, and a common portion before the step 1-4.

2. Thread Group panel modify the parameters

Number of Threads (users): 20

Ramp-Up period (in seconds): 5

Check Forever

3. New Graph Results

Click Users, right, add-> lisenters-Graph Results.

4. Clear the previous test results, click on Start to begin testing

5. After a while, such as Graph Results panel when there is a lot of data, click on the shutdown stopped, my data in the following figure.

Explanation:

The default trace five kinds of indicators, each color representing a different meaning of the data. You can check out a few of which are not recorded. See the above lines, I feel very interesting, like stocks.

Guess you like

Origin www.cnblogs.com/yanghuan55/p/12409961.html
Recommended