Alpha(2/6)

Team name: no no Dai Dai
, head of blog
work blog


Crew case

Zhang overseas

  • Over the past two days to complete the task which
    • Task allocation, monitoring progress
      commit record (the whole group share)

  • The next plan
    • Communication front and rear end members, supervise, remind them to complete their progress as soon as possible
  • Which left the task
    • Perfect interface documentation, meticulous task assignment and completion requirements
    • Burndown (all common group)
  • What are the difficulties encountered
    • How to promote the exchange of team members?
  • What have you learned and questions
    • reward:
    • doubt:
      • The next step in the development process is not clear

Yang Shijie

  • Over the past two days to complete the task which
    • Perfect part of the interface, try to write api documentation. And supports HTTPS access
  • The next plan
    • Improve the database, add more api
  • Which left the task
    • Burndown (all common group)
  • What are the difficulties encountered
    • Because the micro-channel support only https, so even apply for VD SSL certificate into the whole.
  • What have you learned and questions
    • Harvest: the back-end to further deepen understanding.
    • Question: Data transfer large amount of data to be how transfer

Lin Honghai

  • Over the past two days to complete the task which
    • About two days before the page is optimized to do a preliminary understanding of the document and the back-end docking
  • The next plan
    • In-depth understanding of how the data before and after the end of the dock to bind the main page
  • Which left the task
    • Depth understanding of how to bind the data before and after the end of the docking main page beautify good interface
    • Burndown (all common group)
  • What are the difficulties encountered
    • These two days have not encountered any major problem can be resolved are resolved
  • What have you learned and questions
    • Harvest: tomorrow is another beautiful day

Gong Lin Yang

  • Over the past two days to complete the task which
    • Read more some video, learn a bit nicer looking interface design ideas and the results, optimize something.
  • The next plan
    • Further study on the code front-end interface, landscaping codes; learn how to invoke various ports.
  • Which left the task
    • Further study on the code front-end interface, landscaping codes; learn how to invoke various ports.
    • Burndown (all common group)
  • What are the difficulties encountered
    • Interface is really good to get to know.
  • What have you learned and questions
    • Harvest: once again to understand his own weakness.

Su Wei Huan

  • Over the past two days to complete the task which
    • At present only during the preliminary study of knowledge
  • The next plan
    • The basis of further study applet background and understanding of the interaction with the database http protocol
  • Which left the task
    • Burndown (all common group)
  • What are the difficulties encountered
    • Learning objectives is not clear enough, not enough depth study
  • What have you learned and questions
    • Harvest: basic understanding of some use springboot framework mastered the basic method mybatis and operation of the database jpa
    • Wondering: is unclear how to use front-end framework in combination with small programs

Chen Wenbin

  • Over the past two days to complete the task which
    • Front page basically sound.
  • The next plan
    • Details of the front end optimization
  • Which left the task
    • Page beautification
    • Burndown (all common group)
  • What are the difficulties encountered
    • Familiar with small front-end development program

Lin Wentao

  • Over the past two days to complete the task which
    • Front page basically sound.
  • The next plan
    • Details of the front end optimization
  • Which left the task
    • Page design continues to organize
    • Burndown (all common group)
  • What are the difficulties encountered
    • Feeling a little blind, I do not know where there is no system to learn, first with Baidu will say

Wang Qi Hong

  • Over the past two days to complete the task which
    • Understand the development process of small micro-channel program
  • The next plan
    • Learn the back-end development, java language proficiency
  • Which left the task
    • Learn the back-end development, java language proficiency
    • Burndown (all common group)
  • What are the difficulties encountered
    • For program development are not familiar with, many have not read the code in line with
  • What have you learned and questions
    • Harvest: the development of micro-channel programs have a rough understanding

Lin Xiaotang

  • Over the past two days to complete the task which
    • Learn to connect with the initial spring boot with the database;
  • The next plan
    • Learning to write interfaces
  • Which left the task
    • Learn the back-end development, java language proficiency
    • Burndown (all common group)
  • What are the difficulties encountered
    • No contact with Java
  • What have you learned and questions
    • Harvest: learn more about the a technology

Task: to learn the preliminary connection with spring boot with the database;
next plan: to write the interface learning
difficulties: no contact Java
harvest and questions: one to learn more about the technology


Showcase the latest achievements within the group (10 points)

api preliminary written documents

Standup photo (5 points)

Meeting time-consuming record (each additional record) (5 points)

N-meeting Consuming (minutes)
1 13
2 8

Personal PSP (5 points)

PSP2.1 Personal Software Process Stages Estimated time consuming (minutes) The actual time-consuming (minutes)
Planning plan 50 30
· Estimate • Estimate how much time this task requires 50 30
Development Develop 50 50
· Analysis · Needs analysis (including learning new technologies) 50 50
· Design Spec Generate design documents 0 0
· Design Review · Design Review (and his colleagues reviewed the design documents) 0 0
· Coding Standard · Code specifications (development of appropriate norms for the current development) 0 0
· Design · Specific design 0 0
· Coding · Specific coding 0 0
· Code Review · Code Review 0 0
· Test · Test (self-test, modify the code, submit modifications) 0 0
Reporting report 60 30
· Test Report · testing report 0 0
· Size Measurement · Computing workload 0 0
· Postmortem & Process Improvement Plan · Hindsight, and propose process improvement plan 60 30
total 160 110

Personal Learning progress bar ( weekly added ) (5 points)

N-Week New Code (lines) Cumulative codes (lines) This week learning time-consuming (hours) Cumulative learning time-consuming (hours) Important growth
1 0 0 0 0 no
2 300 300 5 5 There is no plan should hit the code, with Axure draw simple prototype map Society
3 1100 1400 23 28 学习网络接口的使用、学习pygame模块的使用
4 0 1400 15 43 学会画燃尽图
5 0 1400 10 53
6 0 1400 3 56 意识到事先规划的重要性
7 150 1550 12 65 明白了团队开发的一般流程、如何使用管理团队代码