PSP2.1 Personal Software Process Stages Estimated time consuming (minutes) The actual time-consuming (minutes)
Planning · Plan 10 10
· Estimate • Estimate how much time this task requires 10 10
Development · Development 180 540
· Analysis · Needs analysis (including learning new technologies) 0 0
· Design Spec Generate design documents 0 0
· Design Review · Design Review 0 0
· Coding Standard · Code specifications (development of appropriate norms for the current development) 0 0
· Design · Specific design 0 0
· Coding · Specific coding 60 120
· Code Review · Code Review 60 180
· Test · Test (self-test, modify the code, submit modifications) 60 240
Reporting report 0 0
· Test repor · testing report 0 0
· Size Measurement · Computing workload 0 0
· Postmortem & Process Improvement Plan · Hindsight, and propose process improvement plan 0 0
· Total 190 550
  • Individual learning progress bar
N-Week New Code (lines) Cumulative codes (lines) This week learning time-consuming (hours) Cumulative learning time-consuming (hours) Important growth
1 0 0 1 1 Learned to use markdown to write blog
2 308 308 20 21 java learning, learning to use performance analysis tools, exception handling
3 225 533 4 25 As well as learning python and python interface development method
4 792 1325 26 51 Coding peak, the basic realization of the cards algorithm
5 404 1729 20 71 Test, change bug, write network interface, finishing work
6 0 1729 10 81 Promotional video starring, writing blog, NABCD learning, learning methods to assess the contribution of team members
7 0 1729 21 102 Integration and publishing of the report, five kinds of fundamental learning and design UML diagram
8 295 2024 5 107 Learn some mainstream API, but the results are poor
9 0 2024 6 113 Learn to access the database in python program
10 212 2236 11 124 Query and insert operations in python database
11 200 2436 9 133 No