Light of future- sprint Day 7

Class attribution → 2019 autumn Charms practice of software engineering class Z
Work requirements → Teamwork fifth - Project sprint
Team Name Light of the future
The target job On the sixth day of the sprint summary
Text of the job → Light of future- sprint Day 7
Other references 1) two hours Getting spring boot Baidu cloud free resource: https://pan.baidu.com/s/11iD76gX1L_uF2nnhgx5wXA extraction code: 3yw8
2) SprintBoot Web Advanced Video
3) SpringBoot integrated JWT achieve token verification
4) Lay the classic ui module front-end framework
5) Bootstrap rookie tutorial
6) iBootStrap drag generated layout
7) About Web front-end password encryption is meaningful summary!
8) IDEA plug-in installation code specifications Ali
9) jQuery newbie tutorial
10) Project Manager essential - use burndown monitor the overall progress of the project
11) Project Management Tools - collar song

1.SCRUM part:

Each member of progress

Names of Members Progress description waste time
Hu Chengyu Today's schedule: perfect foreground to the background data transmission problems 4h
Wenjun Xin Today's schedule: to continue to learn ssm succeeded in reading the data in the database, because mysql version I used was 8.2 multi-version, is inconsistent with previous versions connections, just kept on going finally figured out 2h
Lin Guoqin Today's schedule: Learning the front-end interfaces to access back-end and back-end data is returned successfully received. During configuration, you need to pay attention to two points, one back-end interface address configuration, and second cross-domain problem. 2h
Huang Hung Penang Today's schedule: training 2h
Zhangqi Rong Today's schedule: Find the front and rear end interactive solution to the problem, as well as some code refactoring idea 2h
Ye Yanling Today's schedule: understand the current front-end and back-end link problem, try to solve the problem of misaligned front page of text Order 2h
Wang Xing rain Today's schedule: understand the current front-end and back-end link problem, try to improve the front page link issue 2h
Qiu Wei Xu Today's schedule: Learning the front and rear, have a deeper understanding of the project 4h
Zou fluttering Today's schedule: perfect background with back-end management module interface 2h
Wu Shanshan Today's schedule: perfect background with back-end management module interface, complete the front page link issue 2h

Photo SCRUM meetings

Check-in record

Code run shot

Users browsing interface



Order Details interface



Administrator browser interface

New backend interfaces

2.PM report:

schedule

Expected number of days The number of days already spent The remaining number of days
7 7 0

Burndown

The total task curve

Than the contribution of each member

Crew The proportion of the workload
Huang Hung Penang 10%
Lin Guoqin 10%
Wu Shanshan 10%
Zou fluttering 9%
Hu Chengyu 13%
Wang Xing rain 9%
Zhangqi Rong 10%
Ye Yanling 9%
Qiu Wei Xu 10%
Wenjun Xin 10%