A. Fork warehouse address
GIT address |
|
Blog link |
|
|
Two . PSP form
PSP2.1 |
Personal Software Process Stages |
Estimated time consuming (minutes) |
The actual time-consuming (minutes) |
Planning |
plan |
|
|
· Estimate |
• Estimate how much time this task requires |
|
|
Development |
Develop |
700 |
800 |
· Analysis |
· Needs analysis (including learning new technologies) |
100 |
120 |
· Design Spec |
Generate design documents |
100 |
80 |
· Design Review |
· Design Review (and his colleagues reviewed the design documents) |
20 |
30 |
· Coding Standard |
· Code specifications (development of appropriate norms for the current development) |
20 |
20 |
· Design |
· Specific design |
100 |
100 |
· Coding |
· Specific coding |
120 |
100 |
· Code Review |
· Code Review |
30 |
30 |
· Test |
· Test (self-test, modify the code, submit modifications) |
40 |
40 |
Reporting |
report |
80 |
80 |
· Test Report |
· testing report |
40 |
40 |
· Size Measurement |
· Computing workload |
20 |
20 |
· Postmortem & Process Improvement Plan |
· Hindsight, and propose process improvement plan |
40 |
30 |
|
total |
1420 |
1490 |
III. Calculation module design and implementation of the interface
IV. Code Review
1. We are using the C and C ++ language, refer to the programming of the blog describes specifications .