Xiao Yi Kofi third operation (twinning Liquan Xi)

1, Github twinning project addresses used: https://github.com/15565048308/PairProgramming
2, knot work address of the partner: https://home.cnblogs.com/u/kingxi/
3, twinning Photos:


4 project process
(1) part of the code

(2) randomly named interface display

(3) submit code

5, PSP table
| PSP2.1 | Personal Software process Stages | estimated time consuming (minutes) | actual time-consuming (minutes) |
| - | - | - | - |
| planning | program | 1H | 1h30min |
| estimate | estimated that this task requires much time | 2Day | 2Day |
| development | development | 1H | 1H |
| the analysis | needs analysis (including learning new technology) | 2H | 3H |
| design the Spec | generate design documents | 30min | 30min |
| design review | design review (and colleagues reviewed the design documents) | 30min | 1H |
| Coding Standard | code specifications (for the current development of developing suitable specification) | 1h | 2h |
| design | particular design | 2H | 3H |
| coding | particular coding | 2H | 3H |
| Code Review | code review | 1h | 2h |
| Test | test (self-test, modify the code, submit modifications) | 1H | 2H |
| Reporting | Report | 1H | 1H |
| the Test Report | test reports | 1H | 1H |
| Size the Measurement | computing workload | 30min | 30min |
| Postmortem & process improvement plan | hindsight, and propose process improvement plan | 1H | 1H |
|| total || 2day |