PERT drawing software that professional, how to draw PERT chart

PERT PERT chart is a common chart project management, is mainly used to analyze, document a project from start to finish, what needs to be completed. Therefore, ultimately, in the PERT diagram A graphic symbol is the task form, also known as task box.

Figure billion PERT chart software provides a variety of commonly used shapes and symbols, its simple, intuitive interface, and comes with smart tools, can help you more easily create professional-looking PERT chart. In this paper, the small series will focus on explaining how to use software Edraw quickly create PERT chart.

New PERT PERT chart

Open Figure billion, the new "pre-defined templates and examples of" select " Project Management ", select "PERT chart" template or example of the right side of the software interface.

pert chart template

PERT code

On the left side of the drawing page, you can see a lot of the symbol library drawing PERT chart to use.

Drag a PERT chart table begin drawing task

In the gallery, drag and drop tasks PERT chart table to the drawing page. (Chart type of task table styles, such PERT1, PERT2, PERT3 the like, to select the desired, double-click or drag to the drawing page).

pert task table

The basic task of setting the table

Select Task PERT chart form, the software menu bar will appear above the "Table" Settings menu, then you can begin to adjust the mandate of the table, such as adding / deleting rows or columns, split cells, insert rows / columns, table styles and so on.

pert task table settings

Fill in the information

Double-click the text in the table, you can edit the text.

Change the size of the task table

1, changing table size: Drag the green box to change the size of the table.

Pert adjust table size

2, changing the row, column size: as in Excel as a table in the middle line of the cursor, until the blue color appears broken line, can drag.

Table width adjustment pert

Form fill color change task

1, select the area to change color.

You can select the entire area or a partial area. Hold down the left mouse button, move the mouse, you can select multiple areas. Click on the top left of the task symbol table, optional full. As shown below:

Select pert form

2, the three methods to modify the fill color.

a. Fast color bar at the bottom of the page. The "filled" to "lines", border color can be modified.

b. filling from the "Start", "style" in the menu bar, select the "fill" button.

c. Click on the right side of the toolbar "fill", select the appropriate fill pattern.

pert fill color

Dynamic task connected cable box

1, the drag from the symbol library in a cable make it close to blue flag X on the box.

2, when it turns red, release the mouse, and a cable box will be adsorbent together.

3, the same way a further connecting box on the other end of the line.

Add dynamic connector pert

Add description connecting line

Double-wire connection, a text box will appear. Enter the text, click outside the box to complete the editing area. Tables and continue to connect cables until you finish drawing.

Adding text pert connection lines