One: the prototype design
Two: ER FIG (modeling data)
Three: DFD FIG. (Process Modeling)
IV: Summary of progress
Week 11 : 1. Project Background
2. Project outlook
3. Project Content
4. The scope of the project
Twelfth week : 1. Requirements Analysis
2. Stakeholder analysis
3. The hard data samples
Week 13 : an exploded view Function
2. Prioritize
3. Data Modeling
4. Process Modeling
For Week : 1 prototype design project
2. Summary of progress
Summary :
After four weeks of work, our project has begun to take shape.
The first 11 weeks of work by our project exhibit a bright future, with a general outline.
By 12 weeks of work, we identified the audience of the project, and according to the needs of Party A more detailed features of the project, the analysis determined the platform project run by hard data.
By the 13th week of work, we project function modules decomposition of priority needs are classified, quantified data flow and operational process of the project.
By the 14th week of work, our UI project was designed, the results of previous work by the UI to show up, intuitive display of the project and operation of our structure.
After that, we will make persistent efforts, the teacher's advice, to improve their own shortcomings, according to the plan continue to improve our project towards the eventual produce a satisfactory outcome.