Basic preparation work for building the finished blind box system

Before building the finished blind box system, some important preparations must be done, otherwise the project may face difficulties. First of all, Party A must really have the demand for the blind box project, because it is only meaningful if there is demand.

One of the basic preparations is to have a server. In the initial stage, a server with 4 cores, 8GB memory, and 10Mbps bandwidth is enough. As the number of users increases, it is not too late to consider upgrading the server. In terms of operating system, CentOS-7.9 or Ubuntu 20 are good choices. Personally I prefer the former as it is more stable.

Don’t forget to purchase an appropriate domain name. It is best to use a domain name registered by the operator himself to avoid the risk of losing control after purchasing someone else’s domain name. The domain name must be resolved to the server so that users can find your system over the network.

Login to the registration system is also indispensable. You must consider how users register and log in. You can choose an account and password method, or you can log in with a mobile phone number verification code. You may even consider adding third-party authorized login methods such as WeChat, Weibo, and QQ. Also, don’t forget to design the system name, logo and startup page, which will make the system more personalized.

The payment recharge system is a crucial component. Commonly used payment methods include WeChat payment and Alipay payment. In addition, you can also consider overseas payment methods, such as Visa, PayPal, USDT, etc., or choose a well-known third-party payment platform on the market.

The sharing function plays a vital role in system promotion, so it should be considered in advance when designing the system. It is necessary to clarify the sharing method, such as QR code, link, WeChat sharing and mini program sharing, etc.

These basic preparations must be clearly defined before the project is approved. Whether it is independent development of the system, secondary development or use of existing source code, these tasks must be completed. Party A and Party B need to jointly confirm these configurations, because this is related to product quality, development cycle and cost.

Once the preparation work is completed, the remaining tasks can be handed over to the developer. The developer will complete the development and deliver the system according to the agreed time. In addition, after-sales service is also available, so there is no need to worry about this. In this way, We can successfully build a complete blind box system! (In addition, if there is a need for secondary development, then naturally you need to go through another development process. In the next article, I will talk about secondary development in detail, which is the semi-customized development process)


 

Guess you like

Origin blog.csdn.net/m0_67511426/article/details/131894523