60,000 word fire big data platform construction plan WORD

Guide: The original "122-page 60,000-character fire big data platform construction plan" (see the end of the article for the source), this article selects the essence and structure part, with clear logic and complete content, providing a reference for the rapid formation of pre-sales plans.

Table of contents

Chapter 1 Design Description

1.1 Project overview

1.1.1 Project name

1.1.2 Contractor

1.1.3 Construction goals

1.1.4 Construction Content

1.1.5 Construction scale

1.1.6 Construction period

1.2 Design Basis

1.3 The adjustment of the relative feasibility study report approval

1.4 Reasonable suggestions

1.4.1 Unified and open communication protocol standard

1.4.2 Make full use of network unit fire information resources

1.4.3 Combination of big data technology and effective use of existing technical resources

Chapter 2 Current Situation and Existing Problems

2.1 Project construction background

2.2 The status quo and existing problems of fire big data construction

2.2.1 Current status of informatization construction

2.2.2 Main problems of fire big data

Chapter 3 Requirements Analysis

3.1 Business requirements

3.2 Functional requirements

3.3 Sub-item functional requirements

3.3.1 Requirements for building a basic operating environment

3.3.2 Development of big data management system for fire protection

3.3.3 Develop fire video joint control and management system

3.3.4 Client access part

3.3.5 Develop external data interface

3.4 Performance requirements

3.5 Security and confidentiality requirements

Chapter 4 Overall Design Scheme

4.1 Design principles

4.1.1 National Standards

4.1.2 Principles of system network monitoring and optimization

4.1.3 Advanced Principles of the System

4.1.4 Principles of System Safety and Reliability

4.1.5 System scalability principle

4.1.6 Economic principle

4.1.7 Principle of rationality

4.2 General framework

4.2.1 Monitoring Center

4.2.2 Fire video joint control and management system

4.2.3 Client access part

4.2.4 Provide a special platform for fire department business management: fire supervision and management platform

4.2.5 Communication method

4.3 Network Deployment Architecture

4.4 System operation process

4.4.1 Linkage process of fire alarm monitoring and fire fighting and rescue

4.4.2 Inspection process

4.4.3 Fire maintenance service process

4.4.4 Operation process of fire protection facility maintenance and management

4.4.5 Operation process of fire supervision and inspection

Chapter 5 Itemized System Design

5.1 Design of monitoring management center

5.1.1 Monitoring Center Core Hardware Platform

5.1.2 Application system

5.2 Monitoring Center Hardware Configuration

5.2.1 Server

5.2.2 Storage requirements

5.2.3 Graphic display system

5.3 Client Access System

5.3.1 Overall Design

5.3.2 Fire network transmission terminal

5.3.3 Detection and upload

5.3.4 Information collection content

5.3.5 Networking mode

5.3.6 Network Bandwidth Requirements

5.4 Communication interface service system

5.5 Fire Big Data Integrated Management System

5.5.1 Functions of Fire Remote Monitoring Platform

5.5.2 Functions of Maintenance Intelligent Service Platform

5.5.3 Functions of fire protection maintenance management platform

9. Maintenance job history and statistical queries

5.5.4 Functions of fire protection supervision and management platform

13. The history of fire supervision and inspection and the query statistics of the fire situation in the area

5.5.5 Functions of Networked User Service Platform

5.5.6 User Information Management Platform Functions

5.5.7 Central Configuration Management Platform Functions

5.5.8 Mobile Firefighting Terminal

5.5.9 Comprehensive statistics and query functions

5.5.10 Automatic inspection of fire protection facilities

5.6 Fire video joint control and management system

5.6.1 Current Situation of Fire Monitoring in Networked Units

5.6.2 Basic functional requirements

5.6.3 Requirements for video surveillance management system

5.6.4 Video Transmission Modes of Integrated IoT Transmission Terminals

5.6.5 Front-end Surveillance Video Resources

5.6.6 Requirements for the access point of the fire video joint control system

5.7 Fire Safety Management Information System

5.7.1 Basic data collection of key units

5.7.2 Filling and querying of fire safety management information

5.7.3 Basic data entry / maintenance / retrieval

5.7.4 Audit management of fire safety management information

5.7.5 Electronic file entry / editing / maintenance / retrieval / printing

5.7.6 Management / retrieval of fire laws and regulations

5.7.7 Fire document management

5.8 Editing management system of building fire plan

5.8.1 Building plan editor

5.8.2 Production of each floor plan of the network unit

5.8.3 Building fire plan management system

5.9 Fire GIS

5.10 Information sharing with 119 command center and fire service system

5.11 Database system design

5.12 Software support and development platform

5.12.1 Operating system software

5.12.2 Development Platform Selection

Chapter 6 Design and Deployment of Safety Guarantee System

6.1 Physical Environment Security Design and Deployment

6.2 Network Communication Security Design and Deployment

6.2.1 Data security exchange system

6.2.2 Firewall technology

6.2.3 Access Control

6.2.4 Intrusion Detection System

6.2.5 Data Transmission Encryption

6.3 Application system security design and deployment

6.4 Safety management system

6.5 Safety System Operation Specifications

6.5.1 Staff code of conduct

6.5.2 Password Security Specifications

6.5.3 System management specification

6.5.4 Physical Security Specifications

6.5.5 User access control specification

6.5.6 Login Policy

6.5.7 Safety Confirmation Specifications

6.5.8 Audit specifications

6.5.9 Service Reliability Specifications

Chapter 7 Selection of Main Equipment

7.1 Server system

7.2 Storage device

7.3 IP digital center matrix

7.4 Safety equipment

7.5 Graphic display system

7.6 Fire automatic alarm integrated controller

Chapter 8 Operation and Maintenance Program

7.1 Guiding ideology

7.2 Work objectives

7.3 Basic principles

7.4 Implementation scope

7.5 Basic mode of operation, maintenance and promotion

7.6 Fee Collection Method

7.7 Promotion work plan.

7.8 Safeguards

7.9 Job Requirements

Chapter 9 Project Management and Implementation

9.1 Project organization and personnel

9.1.1 Leadership organization

9.1.2 Project construction agency

9.1.3 Operation and maintenance organization

9.2 Implementation schedule

9.3 Project bidding

9.4 Personnel training in the implementation stage

9.4.1 Training content

9.4.2 Training objects

9.4.3 Training objectives

9.5 Project Quality Management

9.5.1 Management elements

9.5.2 Material elements

Chapter 10 Project Risk and Risk Management

Chapter 11 Key and Difficult Analysis

11.1 Monitoring Center Problems

11.1.1 Large screen

11.1.2 Computer room and related equipment

11.1.3 Capacity limitation and future expansion——District-level monitoring sub-center

11.2 Twenty networked units

11.2.1 Access methods and fees

11.2.2 Selection principles

11.2.3 Suggested distribution of pilot network units

11.3 Video surveillance

11.3.1 Problems

11.3.2 Countermeasures

Chapter 12 Equipment List

12.1 List of third-party software

12.2 List of System Hardware Equipment

12.3 List of system application software

12.4 Plan making and system connection of network units

a5f5f1c1367082e6036d4491f48f0fe7.jpeg

9e4be038a9254e1d0d3dc1363577f7b7.jpeg

e211ae254a8708a27e57ecef655a507e.jpeg

996754b482c85381182682aeaef2da9a.jpeg

eb84751ea1b98908d2cf8723573d0846.jpeg

b66fca2f49c015f673e4d4d925fd23d9.jpeg

8ea1a5fb6c88cfa4c38f3bd014ed6bcd.jpeg

8a7843019818d64b44b3dcf119bcbe6f.jpeg

3172c8f5e0627ac7b46a7533968ad470.jpeg

a8c64abaaf8156701107cf4b239b2a97.jpeg

c00ded24e1117961c346fbc4a54e31e4.jpeg

6b46add2e0864af15e4a382712d312eb.jpeg

73f8477aa223e330d4133ffc9997ae8d.jpeg

9d2d634ae3bc654fe459da1f936086ca.jpeg

957de8adbfe2c29a53c24138367e9635.jpeg

4db1c8ad09de644905d91ef545ec8ba0.jpeg

a484659316d2a23489f2cd8f48e3fba3.jpeg

450d1e4f23de9f20fcfd55738e9eec20.jpeg

766dd73f24e8e695842e0c597a4c457b.jpeg

d27161277fc8b467c799388d872fb115.jpeg

a68f4b50bd70c0accb95b0e6204c0a71.jpeg

89959c84ee4a18547ca59dbb1822cf05.jpeg

b166d4610329be32033e9152059941f6.jpeg

45ff6d9d4a1cf6f6e67f7379027618bf.jpeg

348f68d92352788cc47be35817882ba5.jpeg

c5667b9743b1cec8413f17234f3aa2e5.jpeg

f71cb2308a9af56e4742a2fe5c7924f1.jpeg

bbaa3ceff824501f537ffa468ba8a599.jpeg

84aa78ba00df8743cc78299e210fab3c.jpeg

4d81bed2fe5ba28bb8f7fc27b11f85ae.jpeg

07a6b0302c8ef19bc320033bb683d2dc.jpeg

eeac8bc30f6a81fbb5504ba397bd4501.jpeg

5b938b2fb2929fb68d9242f6a36c8499.jpeg

0b3f80f49d322cfea4ecef04f238febd.jpeg

c31114489bec4154b23d725b52796000.jpeg

fb4f4b900e79013a0fc0f5db44fe2d76.jpeg

607c771ab2c6660b0207def56342712c.jpeg

a9904b15d057e4e062c5bc5e1bc62cb9.jpeg

db3a87476fff49b635078638101be12d.jpeg

518b9a10416076364582f0184ef4385f.jpeg

b4e9ec104088abe3336480fefe7402bc.jpeg

1b783ff105190cb85c257a0826f278c4.jpeg

If you want to get the complete electronic version of the content for reference study, you can follow, like, comment + forward this article, private message for more information