Life In Changsha College- SQA Plan and Acceptance Test Procedure

this task

1. Based on the SCRUM design task completed by the previous group as the background, draw up a virtual SQA plan for the software development task.

2. Compile the acceptance test procedures for the SCRUM design tasks completed by the previous group.


SQA Program

  1. Software Engineering: (to be edited)
  2. Quality assurance:
  3. Quality Control:
  4. Data collection:
    5. Statistical report:

Acceptance Test Procedure

1. Test analysis: (to be edited)
2. Test case:


The program Github address is: https://github.com/CindyICE/LIFE-IN-CHANGDA

Guess you like

Origin http://43.154.161.224:23101/article/api/json?id=325044320&siteId=291194637
SQA
Recommended